* Emittance Measurements - Yan
+
* Emittance Measurements with large laser size (rms=0.423mm) - Yan
  
  

Revision as of 07:44, 26 August 2017

  • Emittance Measurements with large laser size (rms=0.423mm) - Yan


  • New plan:
  1. Finish emittance measurements, including a larger laser size (x4) – August 21-25
  2. Attempt 5 mA (non-magnetized, then magnetized) – August 28-31
  3. Shutdown – September 5:
    1. Install new YAG screen at viewer 3
    2. Fix existing harp and install 20 µm tungsten wire
    3. Add a new CEBAF-style harp with 10 µm tungsten wire (i.e, GTS will have two harps)
    4. Replace leaky vent valve
    5. Replace bad ion pump