Difference between revisions of "GTS meeting 10 16 17"
Jump to navigation
Jump to search
(Created page with "* High current runs * Shutdown Plan: # Install new YAG screen at viewer 3 # Fix existing harp and install 20 µm tungsten wire # Add a new CEBAF-style harp with 10 µm tung...") |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | |||
− | |||
− | |||
* Shutdown Plan: | * Shutdown Plan: | ||
Line 7: | Line 4: | ||
# Fix existing harp and install 20 µm tungsten wire | # Fix existing harp and install 20 µm tungsten wire | ||
# Add a new CEBAF-style harp with 10 µm tungsten wire (''i.e'', GTS will have two harps) | # Add a new CEBAF-style harp with 10 µm tungsten wire (''i.e'', GTS will have two harps) | ||
− | # | + | # Fix leaky vent valve |
− | |||
# Activate new photocathode (new puck) with full active area | # Activate new photocathode (new puck) with full active area | ||
+ | |||
+ | |||
+ | * Map RadiaBeam steerer and measure the electrical characteristics (e.g., time constant) | ||
* Next Shutdown – January 2018: | * Next Shutdown – January 2018: | ||
# Install TE011 cavity | # Install TE011 cavity | ||
+ | |||
+ | |||
+ | * High current runs: [https://logbooks/entry/3488510] |
Latest revision as of 10:46, 16 October 2017
- Shutdown Plan:
- Install new YAG screen at viewer 3
- Fix existing harp and install 20 µm tungsten wire
- Add a new CEBAF-style harp with 10 µm tungsten wire (i.e, GTS will have two harps)
- Fix leaky vent valve
- Activate new photocathode (new puck) with full active area
- Map RadiaBeam steerer and measure the electrical characteristics (e.g., time constant)
- Next Shutdown – January 2018:
- Install TE011 cavity
- High current runs: [1]