− | === | + | ===This Last Week-ish=== |
:Bubble Run | :Bubble Run | ||
::Added new harp w/ temporary controls | ::Added new harp w/ temporary controls | ||
Line 9: | Line 9: | ||
::Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA | ::Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA | ||
::DecaRad installation below outrigger laser table started, heads/cables ready to dress | ::DecaRad installation below outrigger laser table started, heads/cables ready to dress | ||
+ | ::S&A begin 200kV electrode measurements 5/11 (per last week's plan) | ||
::PSS dipole measurements vs. expected gun voltage | ::PSS dipole measurements vs. expected gun voltage | ||
===Next Week and Beyond=== | ===Next Week and Beyond=== | ||
:Bubble will continue to run until next Friday @ 8am | :Bubble will continue to run until next Friday @ 8am | ||
− | :Met w/ Jerry to review PSS integration plans | + | :Met w/ Jerry to review PSS integration plans [[media:SAD18_Upgrade.xlsx]] |
Revision as of 19:37, 10 May 2018
This Last Week-ish
- Bubble Run
- Added new harp w/ temporary controls
- Added ceramic break to radiator (shield aimed downstream), in series w/ FCUP
- Added Gumby (10 sec) laser shutter, tested w/ beam and remote enable/disable
- Added x-ray card to locate beam position
- Upgrade Preparations
- Tested HVPS to 300kV in SF6 tanks at 15psi, and greater
- Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
- DecaRad installation below outrigger laser table started, heads/cables ready to dress
- S&A begin 200kV electrode measurements 5/11 (per last week's plan)
- PSS dipole measurements vs. expected gun voltage
Next Week and Beyond
- Bubble will continue to run until next Friday @ 8am
- Met w/ Jerry to review PSS integration plans media:SAD18_Upgrade.xlsx