Difference between revisions of "UITF Safety Documents"
Line 1: | Line 1: | ||
− | UITF 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility: Operational Safety Procedure #79435 [[File: OSP 79435_748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf]] and [[File: THA for 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf]]. | + | UITF 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility: Operational Safety Procedure #79435 [[File: OSP 79435_748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf]] and [[File: THA for 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf]]. These files can be accessed at https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=79435 |
UITF Commissioning the QCM with RF, no beam acceleration: [[File: OSP 74230_QCM Operation at the Upgraded Injector Test Facility (UITF).pdf]]****[[File:ACC-18-74230-OSP_QCM Commissioning with RF_no beam plus attachments.pdf]] | UITF Commissioning the QCM with RF, no beam acceleration: [[File: OSP 74230_QCM Operation at the Upgraded Injector Test Facility (UITF).pdf]]****[[File:ACC-18-74230-OSP_QCM Commissioning with RF_no beam plus attachments.pdf]] |
Revision as of 13:16, 8 November 2018
UITF 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility: Operational Safety Procedure #79435 File:OSP 79435 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf and File:THA for 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf. These files can be accessed at https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=79435
UITF Commissioning the QCM with RF, no beam acceleration: File:OSP 74230 QCM Operation at the Upgraded Injector Test Facility (UITF).pdf****File:ACC-18-74230-OSP QCM Commissioning with RF no beam plus attachments.pdf
UITF Commissioning the QCM with RF, no beam acceleration, Task Hazard Analysis: File:THA for the OSP 74230 QCM Operation at the Upgraded Injector Test Facility (UITF).pdf
UITF radiation shielding documentation can be found at https://misportal.jlab.org/doc_validation/stages/29
UITF SF6 tank pressure vessel assessment PS-ACC-17-001 can be found in DOCUSHARE at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417
UITF QCM Vacuum Vessel assessment: File:QCM Vacuum Vessel Assessment by Gary Cheng.docx
UITF Laser OSP: File:LOSP ACC-17-64784.pdf
UITF keV Beam Operations OSP (note this is a revision of previously approved OSP): File:OSP UITF keV beam operations approved revision.docx **** File:OSP UITF keV beam operations approved revision.pdf
UITF keV Beam Operations THA (note this is a revision of previously approved THA): File:THA UITF keV beam operations approved revision.pdf
UITF sweep procedure: File:UITF sweep procedure.pdf
UITF preliminary ODH assessment: File:Preliminary ODH assessment for UITF.pdf
UITF Final Approved ODH Assessment: File:UITF ODH Assessment.pdf and available at https://misportal.jlab.org/railsForms/oxygen_deficiency_reviews/74180/edit
UITF Industrial Hygiene Assessment for SF6 exposure: File:UITF SF6 assessment.pdf
UITF TOSP_high voltage conditioning a new photogun with 225kV Spellman supply: File:UITF TOSP gun HV conditioning.pdf **** File:UITF THA gun HV conditioning.pdf