Difference between revisions of "PQB Meeting December 6, 2018"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
1- RTP cell installation in 2019 Winter SAD | 1- RTP cell installation in 2019 Winter SAD | ||
- optics spares (crystals/mounts) | - optics spares (crystals/mounts) | ||
+ | |||
- HV system (2 units w/o pots) | - HV system (2 units w/o pots) | ||
+ | |||
- cable from DAC to HV system | - cable from DAC to HV system | ||
+ | |||
- screen and equations app for DAC | - screen and equations app for DAC | ||
+ | |||
- UVa parts ready (cell + HVPS + dragon boards) | - UVa parts ready (cell + HVPS + dragon boards) | ||
+ | |||
- laser box top hat | - laser box top hat | ||
+ | |||
- schedule (RTP install, beam checkout, back out) | - schedule (RTP install, beam checkout, back out) | ||
+ | |||
- RTP monitoring plan during Spring run | - RTP monitoring plan during Spring run | ||
+ | |||
- 2019 CEBAF schedule | - 2019 CEBAF schedule | ||
+ | |||
- What else? | - What else? | ||
Revision as of 15:14, 4 December 2018
We will meet in TEDF 2559 Thursday December 6 at 4:00 pm EST.
For those calling in we'll use the Blue Jeans [1] audio conference system.
Phone number: 1-888-240-2560 Meeting ID: 3528502673# Meeting URL: http://bluejeans.com/3528502673
Agenda:
1- RTP cell installation in 2019 Winter SAD - optics spares (crystals/mounts)
- HV system (2 units w/o pots)
- cable from DAC to HV system
- screen and equations app for DAC
- UVa parts ready (cell + HVPS + dragon boards)
- laser box top hat
- schedule (RTP install, beam checkout, back out)
- RTP monitoring plan during Spring run
- 2019 CEBAF schedule
- What else?
2- New RTP EDM screen:
- HV controls
- ON/OFF