Difference between revisions of "PQB Meeting December 6, 2018"

From Ciswikidb
Jump to navigation Jump to search
Line 12: Line 12:
 
* optics spares (crystals/mounts)
 
* optics spares (crystals/mounts)
 
* HV system (2 units w/o pots)
 
* HV system (2 units w/o pots)
 
+
* cable from DAC to HV system
- cable from DAC to HV system
+
* screen and equations app for DAC
 
+
* UVa parts ready (cell + HVPS + dragon boards)
- screen and equations app for DAC
+
* laser box top hat
 
+
* schedule (RTP install, beam checkout, back out)
- UVa parts ready (cell + HVPS + dragon boards)
+
* RTP monitoring plan during Spring run
 
+
* 2019 CEBAF schedule
- laser box top hat
+
* what else?
 
 
- schedule (RTP install, beam checkout, back out)
 
 
 
- RTP monitoring plan during Spring run
 
 
 
- 2019 CEBAF schedule
 
 
 
- What else?
 
  
  

Revision as of 15:15, 4 December 2018

We will meet in TEDF 2559 Thursday December 6 at 4:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- RTP cell installation in 2019 Winter SAD

  • optics spares (crystals/mounts)
  • HV system (2 units w/o pots)
  • cable from DAC to HV system
  • screen and equations app for DAC
  • UVa parts ready (cell + HVPS + dragon boards)
  • laser box top hat
  • schedule (RTP install, beam checkout, back out)
  • RTP monitoring plan during Spring run
  • 2019 CEBAF schedule
  • what else?


2- New RTP EDM screen:

  1. HV controls
  2. ON/OFF