(Created page with "*List of modifications: # Replace YAG screen on Viewer 1 # Replace Slit on Viewer 2 with holes assembly # Replace two ion collectors with new ones # Remove modified DP can # M...")
 
Line 3: Line 3:
 
# Replace Slit on Viewer 2 with holes assembly
 
# Replace Slit on Viewer 2 with holes assembly
 
# Replace two ion collectors with new ones
 
# Replace two ion collectors with new ones
 +
# Replace Harp fork (Tony)
 
# Remove modified DP can
 
# Remove modified DP can
# Move DP can 1 to end of beamline
 
 
# Remove Faraday Cup
 
# Remove Faraday Cup
 
# Remove bellow upstream of dump
 
# Remove bellow upstream of dump
# Replace Harp fork (Tony)
 
 
# Install TE011 Cavity
 
# Install TE011 Cavity
 
# Install Deflecting Cavity
 
# Install Deflecting Cavity
 +
# Install 4th solenoid
 +
# Move DP can 1 to end of beamline
 +
# All bellows at least 2.5 inch diameter

Revision as of 10:00, 3 January 2019

  • List of modifications:
  1. Replace YAG screen on Viewer 1
  2. Replace Slit on Viewer 2 with holes assembly
  3. Replace two ion collectors with new ones
  4. Replace Harp fork (Tony)
  5. Remove modified DP can
  6. Remove Faraday Cup
  7. Remove bellow upstream of dump
  8. Install TE011 Cavity
  9. Install Deflecting Cavity
  10. Install 4th solenoid
  11. Move DP can 1 to end of beamline
  12. All bellows at least 2.5 inch diameter