Difference between revisions of "GTS meeting 1 07 19"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
# Install TE011 Cavity | # Install TE011 Cavity | ||
# Install Deflecting Cavity | # Install Deflecting Cavity | ||
− | # Install new | + | # Install new 5th solenoid |
# Move DP can 1 to end of beamline | # Move DP can 1 to end of beamline | ||
# All bellows at least 2.5 inch diameter | # All bellows at least 2.5 inch diameter |
Revision as of 10:02, 3 January 2019
- List of modifications:
- Replace YAG screen on Viewer 1
- Replace Slit on Viewer 2 with holes assembly
- Replace two ion collectors with new ones
- Replace Harp fork (Tony)
- Remove modified DP can
- Remove Faraday Cup
- Remove bellow upstream of dump
- Install TE011 Cavity
- Install Deflecting Cavity
- Install new 5th solenoid
- Move DP can 1 to end of beamline
- All bellows at least 2.5 inch diameter