Difference between revisions of "GTS meeting 3 04 19"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
* List of things to do: | * List of things to do: | ||
+ | # RadCon Group to check for x-rays from DQWR cavity | ||
# Calibrate new DQWR RF power supply up to 500 W | # Calibrate new DQWR RF power supply up to 500 W | ||
# Measure bunch length using new RF supply | # Measure bunch length using new RF supply | ||
Line 10: | Line 11: | ||
− | * Vacuum work to re-tune DQWR cavity | + | * Vacuum work to re-tune DQWR cavity (scheduled for Friday15 March, 2019) |
Revision as of 12:43, 4 March 2019
- Laser frequency is at 499.20025 MHz
- List of things to do:
- RadCon Group to check for x-rays from DQWR cavity
- Calibrate new DQWR RF power supply up to 500 W
- Measure bunch length using new RF supply
- Commission TE011 cavity
- Radiation Surveys at 1 mA
- Measure Drift Emittance at 100, 200 and 300 kV
- Vacuum work to re-tune DQWR cavity (scheduled for Friday15 March, 2019)