* List of things to do:
 
* List of things to do:
 +
# RadCon Group to check for x-rays from DQWR cavity
 
# Calibrate new DQWR RF power supply up to 500 W
 
# Calibrate new DQWR RF power supply up to 500 W
 
# Measure bunch length using new RF supply
 
# Measure bunch length using new RF supply
Line 10: Line 11:
  
  
* Vacuum work to re-tune DQWR cavity
+
* Vacuum work to re-tune DQWR cavity (scheduled for Friday 15 March, 2019)

Latest revision as of 08:54, 10 March 2019

  • Laser frequency is at 499.20025 MHz


  • List of things to do:
  1. RadCon Group to check for x-rays from DQWR cavity
  2. Calibrate new DQWR RF power supply up to 500 W
  3. Measure bunch length using new RF supply
  4. Commission TE011 cavity
  5. Radiation Surveys at 1 mA
  6. Measure Drift Emittance at 100, 200 and 300 kV


  • Vacuum work to re-tune DQWR cavity (scheduled for Friday 15 March, 2019)