Difference between revisions of "GTS meeting 3 25 19"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "* '''Laser 10 W Fiber Amp will be moved to Hall A Compton on April 8, 2019''' * List of things to do: # Calibrate new DQWR RF power supply up to 500 W # Measure bunch length...")
 
 
Line 3: Line 3:
  
 
* List of things to do:
 
* List of things to do:
# Calibrate new DQWR RF power supply up to 500 W
 
# Measure bunch length using new RF supply
 
 
# Transverse beam emittance measurement with 1D pepper-pot
 
# Transverse beam emittance measurement with 1D pepper-pot
 
# Commission TE011 cavity
 
# Commission TE011 cavity

Latest revision as of 08:12, 24 March 2019

  • Laser 10 W Fiber Amp will be moved to Hall A Compton on April 8, 2019


  • List of things to do:
  1. Transverse beam emittance measurement with 1D pepper-pot
  2. Commission TE011 cavity
  3. Radiation Surveys at 1 mA
  4. Measure Drift Emittance at 200 and 300 kV and laser rms = 0.9 mm
  5. Ghost beam studies with P-Gun