Difference between revisions of "UITF Safety Documents"
Line 9: | Line 9: | ||
UITF radiation shielding documentation can be found at https://misportal.jlab.org/doc_validation/stages/29 | UITF radiation shielding documentation can be found at https://misportal.jlab.org/doc_validation/stages/29 | ||
− | UITF SF6 tank pressure vessel assessment PS-ACC-17-001 can be found in DOCUSHARE at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38867 | + | UITF SF6 tank pressure vessel assessment PS-ACC-17-001 can be found in DOCUSHARE at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38867 (Note, the pressure vessel assessment for a similar SF6 tank used at CEBAF can be found at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417) |
UITF QCM Vacuum Vessel assessment: [[File:QCM Vacuum Vessel Assessment by Gary Cheng.docx]] | UITF QCM Vacuum Vessel assessment: [[File:QCM Vacuum Vessel Assessment by Gary Cheng.docx]] |
Revision as of 14:56, 3 April 2019
Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF ENP-18-80380-OSP File:Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF ENP-18-80380-OSP.pdf
UITF 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility: Revised OSP #82655 File:Revised OSP 82655 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf and File:Revised THA for 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf. These files can be accessed at https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?ENTRY_ID=82655
UITF Commissioning the QCM with RF, no beam acceleration, revision2: https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82424 File:OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.pdf****File:OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.docx
UITF Commissioning the QCM with RF, no beam acceleration, Task Hazard Analysis, revision2: File:THA for the OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF)revision2.pdf
UITF radiation shielding documentation can be found at https://misportal.jlab.org/doc_validation/stages/29
UITF SF6 tank pressure vessel assessment PS-ACC-17-001 can be found in DOCUSHARE at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38867 (Note, the pressure vessel assessment for a similar SF6 tank used at CEBAF can be found at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417)
UITF QCM Vacuum Vessel assessment: File:QCM Vacuum Vessel Assessment by Gary Cheng.docx
UITF Laser OSP: File:LOSP ACC-17-64784.pdf
UITF keV Beam Operations OSP (note this is revision3 of previously approved OSP): File:OSP UITF keV beam operations approved revision3.docx **** File:OSP UITF keV beam operations approved revision3.pdf **** File:OSP-UITF keV beam operations approved revision3 approved OSP format with signatures.pdf
UITF keV Beam Operations THA (note this is revision3 of previously approved THA): File:THA UITF keV beam operations approved revision3.pdf
UITF sweep procedure, updated 2/11/2019: available on Docushare at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-27533 and here: File:UITF sweep procedure Rev. 19.0; February 4, 2019.pdf
UITF preliminary ODH assessment: File:Preliminary ODH assessment for UITF.pdf
UITF Final Approved ODH Assessment: File:UITF ODH Assessment.pdf and available at https://misportal.jlab.org/railsForms/oxygen_deficiency_reviews/74180/edit
UITF Industrial Hygiene Assessment for SF6 exposure: File:UITF SF6 assessment.pdf
UITF TOSP_high voltage conditioning a new photogun with 225kV Spellman supply: File:UITF TOSP gun HV conditioning.pdf **** File:UITF THA gun HV conditioning.pdf