Line 9: | Line 9: | ||
# Commission TE011 cavity | # Commission TE011 cavity | ||
# Radiation Surveys at 1 mA | # Radiation Surveys at 1 mA | ||
− | # Measure Drift Emittance at 200 and 300 kV and laser rms = 0.9 mm | + | # Measure Drift Emittance at 200 and 300 kV and laser rms = 0.9 mm '''completed''' |
# Ghost beam studies with P-Gun | # Ghost beam studies with P-Gun |
Revision as of 09:27, 8 April 2019
- Laser 10 W Fiber Amp will be moved to Hall A Compton on April 8, 2019
- Laser 5 W Fiber Amp will be installed on April 22, 2019
- List of things to do:
- Transverse beam emittance measurement with 1D pepper-pot
- Commission TE011 cavity
- Radiation Surveys at 1 mA
- Measure Drift Emittance at 200 and 300 kV and laser rms = 0.9 mm completed
- Ghost beam studies with P-Gun