* ATLis Tasks: | * ATLis Tasks: | ||
− | # Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun | + | # Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19153] |
# Install New Spellman HV Supply at GTS (150 kV, 67 mA) | # Install New Spellman HV Supply at GTS (150 kV, 67 mA) | ||
# Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode | # Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode |
Revision as of 13:32, 3 May 2019
- IPAC 2019 [1]:
- Abstracts:
- S. A. K. Wijethunga et al., “Characterization of the Magnetized Electron Beam for the Jleic Electron Cooler”, presented at the 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, paper MOPRB110.
- S. Zhang, “to be revised”, presented at the 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, paper THPGW093.
- Proceedings:
- NAPAC 2019 [2]:
- Abstract Submission deadline: 15 May 2019
- ATLis Tasks:
- Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [3]
- Install New Spellman HV Supply at GTS (150 kV, 67 mA)
- Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode
- Install Thermionic Gun at GTS
- TOSP:
- Operation of Thermionic Gun Hot Deck