Difference between revisions of "GTS meeting 5 13 19"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
* IPAC 2019 [https://ipac19.org/]:
 
* IPAC 2019 [https://ipac19.org/]:
 
# Abstracts:
 
# Abstracts:
## S. A. K. Wijethunga et al., “Characterization of the Magnetized Electron Beam for the Jleic Electron Cooler”, presented at the 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, paper MOPRB110.
+
## [n] S. A. K. Wijethunga et al., “Simulation Study of the Emittance Measurements in  Magnetized Electron Beam”, presented at the 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, paper MOPRB110.
## S. Zhang, “to be revised”, presented at the 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, paper THPGW093.  
+
## S. Zhang et al., “High Current High Charge Magnetized and Bunched Electron Beam from a DC Photogun for JLEIC Cooler”, presented at the 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, paper TUPTS105.
 +
## M. S. Stefani et al., “Magnetized Gridded Thermionic Electron Source”, presented at the 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, paper TUPTS093.
 
# Proceedings:
 
# Proceedings:
 
# Posters:
 
# Posters:

Revision as of 07:11, 24 May 2019

  1. Abstracts:
    1. [n] S. A. K. Wijethunga et al., “Simulation Study of the Emittance Measurements in Magnetized Electron Beam”, presented at the 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, paper MOPRB110.
    2. S. Zhang et al., “High Current High Charge Magnetized and Bunched Electron Beam from a DC Photogun for JLEIC Cooler”, presented at the 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, paper TUPTS105.
    3. M. S. Stefani et al., “Magnetized Gridded Thermionic Electron Source”, presented at the 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, paper TUPTS093.
  2. Proceedings:
  3. Posters:


  • NAPAC 2019 [2]:
    • Abstract submission deadline: 15 May 2019


  • ATLis Tasks:
  1. Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [3]
  2. Install New Spellman HV Supply at GTS (150 kV, 67 mA) [4]
  3. Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode [5]


  • TOSP:
  1. Operation of Thermionic Gun Hot Deck