Difference between revisions of "GTS meeting 9 09 19"
Jump to navigation
Jump to search
(Created page with "*Update: ** Replaced thermionic cathode ** Added leak valve on mini-flange ** Started Kr processing *Talking Points: ** Equipment damage during HV processing: Radiation gam...") |
(No difference)
|
Revision as of 08:30, 8 September 2019
- Update:
- Replaced thermionic cathode
- Added leak valve on mini-flange
- Started Kr processing
- Talking Points:
- Equipment damage during HV processing: Radiation gamma probe (again), Cathode Solenoid LCW flowmeter chassis (again)