(Created page with "*Update: ** Kr processing attempted - not really successful. ** 2 days under vacuum at 120kV, but with radiation increasing. ** Spare cathode is dead *Talking Points: ** Equi...") |
|||
(4 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
*Update: | *Update: | ||
− | ** | + | ** Glassman control chassis broken |
− | ** | + | ** Installed alternate Spellman supply (XRV225N3000: 225 kV, 30 mA, 3000 W unipolar mode supply) |
− | ** | + | |
+ | |||
+ | * To Be Fixed | ||
+ | ** LCW chassis | ||
+ | ** Glassman chassis | ||
− | |||
− | |||
− | |||
*Suggested Actions: | *Suggested Actions: | ||
− | ** Open up the gun - look for damage (take care with cathode) | + | ** Test gun with spellman for trips on PSS |
− | ** | + | ** Open up the gun - look for damage (take care with cathode) |
− | + | ** Manufacture RF cage for gun. -> Have model from Xelera to begin this work. |
Latest revision as of 09:23, 16 September 2019
- Update:
- Glassman control chassis broken
- Installed alternate Spellman supply (XRV225N3000: 225 kV, 30 mA, 3000 W unipolar mode supply)
- To Be Fixed
- LCW chassis
- Glassman chassis
- Suggested Actions:
- Test gun with spellman for trips on PSS
- Open up the gun - look for damage (take care with cathode)
- Manufacture RF cage for gun. -> Have model from Xelera to begin this work.