Difference between revisions of "GTS meeting 9 16 19"
Jump to navigation
Jump to search
(2 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
*Update: | *Update: | ||
** Glassman control chassis broken | ** Glassman control chassis broken | ||
− | ** Installed alternate Spellman supply | + | ** Installed alternate Spellman supply (XRV225N3000: 225 kV, 30 mA, 3000 W unipolar mode supply) |
Line 12: | Line 12: | ||
** Test gun with spellman for trips on PSS | ** Test gun with spellman for trips on PSS | ||
** Open up the gun - look for damage (take care with cathode) | ** Open up the gun - look for damage (take care with cathode) | ||
− | ** Manufacture RF cage for gun. | + | ** Manufacture RF cage for gun. -> Have model from Xelera to begin this work. |
Latest revision as of 09:23, 16 September 2019
- Update:
- Glassman control chassis broken
- Installed alternate Spellman supply (XRV225N3000: 225 kV, 30 mA, 3000 W unipolar mode supply)
- To Be Fixed
- LCW chassis
- Glassman chassis
- Suggested Actions:
- Test gun with spellman for trips on PSS
- Open up the gun - look for damage (take care with cathode)
- Manufacture RF cage for gun. -> Have model from Xelera to begin this work.