(Created page with "== (1) Get GTS back to operational == To Fix List (to get GTS running): * Glassman PSS Chassis (Service request to Omar - Carlos) * LCW Chassis (Sarin/ Mike Todd - follow up...") |
|||
Line 4: | Line 4: | ||
* Glassman PSS Chassis (Service request to Omar - Carlos) | * Glassman PSS Chassis (Service request to Omar - Carlos) | ||
− | * LCW Chassis (Sarin | + | * LCW Chassis (Sarin- Fay follow up) |
− | + | * Spellman (should arrive today) | |
− | * Spellman ( | ||
* Picoammeter x2? (Pete Francis in hand - sent for fix) | * Picoammeter x2? (Pete Francis in hand - sent for fix) | ||
+ | * Viewers insertion boxes bad | ||
To Check: | To Check: | ||
− | + | ||
* Magnets (IOC check) | * Magnets (IOC check) | ||
− | * Harp ( | + | * Cathode solenoid - power supply |
+ | |||
+ | Good | ||
+ | * Harp (fuse replaced) | ||
* Cavities (electronics) | * Cavities (electronics) | ||
− | * | + | * Turbo (fixed itself) |
== (2) T-Gun Upgrades == | == (2) T-Gun Upgrades == |
Revision as of 10:06, 30 September 2019
(1) Get GTS back to operational
To Fix List (to get GTS running):
- Glassman PSS Chassis (Service request to Omar - Carlos)
- LCW Chassis (Sarin- Fay follow up)
- Spellman (should arrive today)
- Picoammeter x2? (Pete Francis in hand - sent for fix)
- Viewers insertion boxes bad
To Check:
- Magnets (IOC check)
- Cathode solenoid - power supply
Good
- Harp (fuse replaced)
- Cavities (electronics)
- Turbo (fixed itself)
(2) T-Gun Upgrades
Need a safe gun - no devastating trips. Limit voltage to 135kV
RF cage - Features:
- HV attaches through the back as designed.
- G10 plate to support the HV cable
- Nitrogen flow, also through G10 plate aimed at the back of the hot deck
- Nitrogen flow, though the top of the cage, aimed at ceramic
- Dimensions need to be longer than the table to keep E fields on the hot deck lower than 3MV/m (air breakdown)
To Fix/Modify:
- DC bias supply - set point fix (John Musson)
- RF Cage (Mark/Fay)
- Back plate to allow increased cooling (open the hole)
- Move Xelera spellman to the GTS vault
- Software issues (contact Spellman again)
- Install new fiber link & check
(3)
Housekeeping:
- Remove RXX cables from GTS
- Remove JLab spellman
- Sort out the air and nitrogen lines.
- Buy a shop vac (ask Bubba)