== (1) Get GTS back to operational ==
+
'''Limit voltage to 135kV'''
 +
 
 +
== (1) Status ==
 +
 
 +
* Gun assembled with ceramic and blank flange only. Pumping.
 +
* RF cage complete
 +
* Back plate modified and hot deck attached in 'run set-up'
 +
* Electrode assembled and snow cleaned ready for installation
 +
* GTS clean
 +
 
 +
== (2) Plans ==
 +
* PSS cert
 +
* Run up Xelera spellman connected to gun to 135kV
 +
* If corona test good... break vacuum and install electrodes
  
 
To Fix List (to get GTS running):
 
To Fix List (to get GTS running):
  
 
* Glassman PSS Chassis (Service request to Omar - Carlos)
 
* Glassman PSS Chassis (Service request to Omar - Carlos)
* LCW Chassis (Sarin- Fay follow up)
+
* LCW Chassis (Coleman today or tomorrow)
* Spellman (should arrive today)
+
* Spellman (needs further investigation)
 
* Picoammeter x2? (Pete Francis in hand - sent for fix)
 
* Picoammeter x2? (Pete Francis in hand - sent for fix)
 
* Viewers insertion boxes bad
 
* Viewers insertion boxes bad
Line 14: Line 27:
 
* Cathode solenoid - power supply
 
* Cathode solenoid - power supply
  
Good
+
== (4) T-Gun Upgrades ==
* Harp (fuse replaced)
 
* Cavities (electronics)
 
* Turbo (fixed itself)
 
 
 
== (2) T-Gun Upgrades ==
 
 
 
Need a safe gun - no devastating trips.
 
'''Limit voltage to 135kV'''
 
 
 
RF cage - Features:
 
* HV attaches through the back as designed.
 
* G10 plate to support the HV cable
 
* Nitrogen flow, also through G10 plate aimed at the back of the hot deck
 
* Nitrogen flow, though the top of the cage, aimed at ceramic
 
* Dimensions need to be longer than the table to keep E fields on the hot deck lower than 3MV/m (air breakdown)
 
  
 
To Fix/Modify:
 
To Fix/Modify:
 
* DC bias supply - set point fix (John Musson)
 
* DC bias supply - set point fix (John Musson)
* RF Cage (Mark/Fay)
 
* Back plate to allow increased cooling (open the hole - Fay talk to Vince)
 
 
* Software issues (Karl to contact Spellman again)
 
* Software issues (Karl to contact Spellman again)
 
* Install new fiber link & check (CW setting - Mark emailed company)
 
* Install new fiber link & check (CW setting - Mark emailed company)
 
* Need RF fiber from Karl for reflected power
 
* Need RF fiber from Karl for reflected power
  
== (3) ==
+
== (5) Housekeeping==
Housekeeping:
+
 
* Remove RXX cables from GTS
 
 
* Remove JLab spellman
 
* Remove JLab spellman
 
* Sort out the air and nitrogen lines.
 
* Sort out the air and nitrogen lines.
* Vacuum clean!
 

Revision as of 07:31, 7 October 2019

Limit voltage to 135kV

(1) Status

  • Gun assembled with ceramic and blank flange only. Pumping.
  • RF cage complete
  • Back plate modified and hot deck attached in 'run set-up'
  • Electrode assembled and snow cleaned ready for installation
  • GTS clean

(2) Plans

  • PSS cert
  • Run up Xelera spellman connected to gun to 135kV
  • If corona test good... break vacuum and install electrodes

To Fix List (to get GTS running):

  • Glassman PSS Chassis (Service request to Omar - Carlos)
  • LCW Chassis (Coleman today or tomorrow)
  • Spellman (needs further investigation)
  • Picoammeter x2? (Pete Francis in hand - sent for fix)
  • Viewers insertion boxes bad

To Check:

  • Magnets (IOC check)
  • Cathode solenoid - power supply

(4) T-Gun Upgrades

To Fix/Modify:

  • DC bias supply - set point fix (John Musson)
  • Software issues (Karl to contact Spellman again)
  • Install new fiber link & check (CW setting - Mark emailed company)
  • Need RF fiber from Karl for reflected power

(5) Housekeeping

  • Remove JLab spellman
  • Sort out the air and nitrogen lines.