Difference between revisions of "January 23, 2020 - Mechanical engineering"
Jump to navigation
Jump to search
(Created page with "From last week... ==ME updates== * Danny has updated layout w/ correct chopper beamline solenoids * Shaun has developed a design to fixture and align the beam line solenoids...") |
|||
Line 8: | Line 8: | ||
* Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2" | * Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2" | ||
* Shaun/Joe are working to get laser room and outrigger table into CAD model | * Shaun/Joe are working to get laser room and outrigger table into CAD model | ||
+ | |||
+ | ==Quick links== | ||
+ | * [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABNsJ15YGBFTQkkMenD_ommQ Link to AIPINJ OneDrive folder] | ||
+ | |||
+ | * [[AIPINJ Layouts]] |
Revision as of 20:56, 22 January 2020
From last week...
ME updates
- Danny has updated layout w/ correct chopper beamline solenoids
- Shaun has developed a design to fixture and align the beam line solenoids
- Phil is tallying available BPM's types (tunnel + labs)
- Marcy is checking on metallized YAG screen w/ hole
- Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2"
- Shaun/Joe are working to get laser room and outrigger table into CAD model