Difference between revisions of "January 27, 2020 - Resource Meeting"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
* Mailing list => aipinj@jlab.org | * Mailing list => aipinj@jlab.org | ||
+ | |||
+ | * ME group (Danny Machie, Shaun Gregory, Jeff Hoerger) | ||
== Many good things happening, down the beam line... == | == Many good things happening, down the beam line... == | ||
− | + | * New 200kV small shed cathode electrode at machine shop (like electron at UITF) | |
− | + | * New gun 10" anode flange being designed to locate a steering coil closer to the gun | |
+ | * Phil/Marcy starting to NEG coat vacuum chambers; need a 1kW sputtering PS that works (1 kV, 1 mA) | ||
+ | * PO for 200 kV injector solenoids written (delivery April - June) | ||
+ | * Shaun designed alignment fixture for new beam line solenoids | ||
+ | * PO for 200 kV Wien magnet coils written (delivery March) | ||
+ | * PO to be written for new 15 deg dipole next week | ||
+ | * Chase assigning new names for dipole and solenoids | ||
+ | * Starting to study which laser vacuum window to use 2-3/4" as-is, or 4-1/2" | ||
+ | * Curt waiting on kV spec for prebuncher @ 200 kV, for Watt in S.S. cavity | ||
+ | * Reza/Alicia/Dennis evaluating re-ordering of layout | ||
+ | * Looking at installing valve downstream of chopper #2 this down | ||
+ | * Gary Cheng inquiring about checking cryo lines between QCM and Booster | ||
+ | * 5D beam line will be removed | ||
+ | * Neil/Anthony working plan to build table to move QCM/Booster | ||
Revision as of 12:42, 23 January 2020
Announcements
- Injector upgrade calendar
- Run (now - May 6)
- Phase 1 (May 6 - end of 2020)
- Run (Jan 2021 - Sep 13 2021)
- Phase 2 (Sep 13 - end of 2021)
- Mailing list => aipinj@jlab.org
- ME group (Danny Machie, Shaun Gregory, Jeff Hoerger)
Many good things happening, down the beam line...
- New 200kV small shed cathode electrode at machine shop (like electron at UITF)
- New gun 10" anode flange being designed to locate a steering coil closer to the gun
- Phil/Marcy starting to NEG coat vacuum chambers; need a 1kW sputtering PS that works (1 kV, 1 mA)
- PO for 200 kV injector solenoids written (delivery April - June)
- Shaun designed alignment fixture for new beam line solenoids
- PO for 200 kV Wien magnet coils written (delivery March)
- PO to be written for new 15 deg dipole next week
- Chase assigning new names for dipole and solenoids
- Starting to study which laser vacuum window to use 2-3/4" as-is, or 4-1/2"
- Curt waiting on kV spec for prebuncher @ 200 kV, for Watt in S.S. cavity
- Reza/Alicia/Dennis evaluating re-ordering of layout
- Looking at installing valve downstream of chopper #2 this down
- Gary Cheng inquiring about checking cryo lines between QCM and Booster
- 5D beam line will be removed
- Neil/Anthony working plan to build table to move QCM/Booster