(Created page with ";Mechanical * What is the bellows type count, how may 3" and 3.5"? * Chris, do you have all as-founds you need? * Move pedestals ok? : Anthony says yes, do it ;Controls * Chr...")
 
Line 2: Line 2:
 
* What is the bellows type count, how may 3" and 3.5"?
 
* What is the bellows type count, how may 3" and 3.5"?
 
* Chris, do you have all as-founds you need?
 
* Chris, do you have all as-founds you need?
* Move pedestals ok?
+
* Use C channel everywhere and move pedestals ok?
 
: Anthony says yes, do it
 
: Anthony says yes, do it
 +
* Carlos, send Shaun Wien feedthrough p/n
 +
* SS or Al brackets?
 +
: Use Al, now all 7-3/4" girder to beam line, girder holes whereever imagine support
 +
* NEG chambers
 +
: Detail Y- 10" flange, NEG's here
 +
: Flip DP for IP beam left, modify for new NEG's?
 +
* Laser vacuum window?
 +
: Caryn started evaluating
 +
: Layout tight, how to fit optics, inside laser room?
 +
* 2I spools?
 +
: ME will order, need in time to a) weld capture solenoid, b) NEG coat
 +
* New BPM's
 +
: Design done, feedthroughs ordered, waiting on req to MDC
 +
* Solenoid fixtures?
 +
 +
;Magnets
 +
* Dipole
 +
: Emerson backed out, Milhous quoting round/square, Lakshimi working on Jay's AT design
 +
* Soleonids
 +
: Joe M. what is status?
 +
* Quads
 +
:Have 3 QW, Mike testing 2 spare QW quads (capture on welded cross)
 +
* Correctors
 +
: Joe G make tally
 +
* Wien
 +
: Technicoil getting ready to wind
 +
* PSS Kicker
 +
: Met w/ Jerry, Lakshimi working on upgraded kicker to move 200 keV beam 1cm @ 30 cm w < 200 mA (March 9 layout)
 +
 +
;Orders
 +
* Bellows - waiting on final count
 +
* Right angle valves - we have 5 or 6, should be ok?
 +
* Gun 10" flange - signed req for (2)
 +
* BPM feedthroughs - ordered
 +
* BPM cans - waiting on req to MDC
  
 
;Controls
 
;Controls
 
* Chris, what cameras will you use, will they fit?
 
* Chris, what cameras will you use, will they fit?
* Mike, are the spare QW's okay?
 
 
* Mark/Dave, do you have a plan for 2500W solid state chopper amps?
 
* Mark/Dave, do you have a plan for 2500W solid state chopper amps?
 
* Mark/Dave, do you have a plan for Brock prebuncher cavity/amp?
 
* Mark/Dave, do you have a plan for Brock prebuncher cavity/amp?
* Neil, do you  
+
* Omar, do you have BPM channel?
 +
: Yes!
  
 
;Modelers
 
;Modelers
Line 19: Line 54:
 
* Can a YAG go at the laser screen, I don't think so?
 
* Can a YAG go at the laser screen, I don't think so?
 
* Is the beam envelope OK for ways we run spin rotators?
 
* Is the beam envelope OK for ways we run spin rotators?
 +
: What are the currents and/or B's for the solenoids and quads?
 
* What are the power levels for existing or Brock prebuncher cavities, for 130 or 200 keV locations?
 
* What are the power levels for existing or Brock prebuncher cavities, for 130 or 200 keV locations?
 
* Is distance from MFG1I04A to upstream corrector far enough? or move MFG1I04A downstream, how far?
 
* Is distance from MFG1I04A to upstream corrector far enough? or move MFG1I04A downstream, how far?
 
:Jay is running cases
 
:Jay is running cases
 
* Is the corrector/bpm downstream A1 useful?
 
* Is the corrector/bpm downstream A1 useful?
 +
 +
;Commissioning
 +
* Plan for May gun work?

Revision as of 06:08, 11 March 2020

Mechanical
  • What is the bellows type count, how may 3" and 3.5"?
  • Chris, do you have all as-founds you need?
  • Use C channel everywhere and move pedestals ok?
Anthony says yes, do it
  • Carlos, send Shaun Wien feedthrough p/n
  • SS or Al brackets?
Use Al, now all 7-3/4" girder to beam line, girder holes whereever imagine support
  • NEG chambers
Detail Y- 10" flange, NEG's here
Flip DP for IP beam left, modify for new NEG's?
  • Laser vacuum window?
Caryn started evaluating
Layout tight, how to fit optics, inside laser room?
  • 2I spools?
ME will order, need in time to a) weld capture solenoid, b) NEG coat
  • New BPM's
Design done, feedthroughs ordered, waiting on req to MDC
  • Solenoid fixtures?
Magnets
  • Dipole
Emerson backed out, Milhous quoting round/square, Lakshimi working on Jay's AT design
  • Soleonids
Joe M. what is status?
  • Quads
Have 3 QW, Mike testing 2 spare QW quads (capture on welded cross)
  • Correctors
Joe G make tally
  • Wien
Technicoil getting ready to wind
  • PSS Kicker
Met w/ Jerry, Lakshimi working on upgraded kicker to move 200 keV beam 1cm @ 30 cm w < 200 mA (March 9 layout)
Orders
  • Bellows - waiting on final count
  • Right angle valves - we have 5 or 6, should be ok?
  • Gun 10" flange - signed req for (2)
  • BPM feedthroughs - ordered
  • BPM cans - waiting on req to MDC
Controls
  • Chris, what cameras will you use, will they fit?
  • Mark/Dave, do you have a plan for 2500W solid state chopper amps?
  • Mark/Dave, do you have a plan for Brock prebuncher cavity/amp?
  • Omar, do you have BPM channel?
Yes!
Modelers
  • Is the March 9th layout ok?
  • Is the harp location OK for solenoid scans?
  • Should a viewer remain at the harp location, should this be a YAG?
  • Where else should YAG's go?
  • Can a YAG go at the laser screen, I don't think so?
  • Is the beam envelope OK for ways we run spin rotators?
What are the currents and/or B's for the solenoids and quads?
  • What are the power levels for existing or Brock prebuncher cavities, for 130 or 200 keV locations?
  • Is distance from MFG1I04A to upstream corrector far enough? or move MFG1I04A downstream, how far?
Jay is running cases
  • Is the corrector/bpm downstream A1 useful?
Commissioning
  • Plan for May gun work?