Line 2: | Line 2: | ||
* What is the bellows type count, how may 3" and 3.5"? | * What is the bellows type count, how may 3" and 3.5"? | ||
* Chris, do you have all as-founds you need? | * Chris, do you have all as-founds you need? | ||
− | * | + | * Use C channel everywhere and move pedestals ok? |
: Anthony says yes, do it | : Anthony says yes, do it | ||
+ | * Carlos, send Shaun Wien feedthrough p/n | ||
+ | * SS or Al brackets? | ||
+ | : Use Al, now all 7-3/4" girder to beam line, girder holes whereever imagine support | ||
+ | * NEG chambers | ||
+ | : Detail Y- 10" flange, NEG's here | ||
+ | : Flip DP for IP beam left, modify for new NEG's? | ||
+ | * Laser vacuum window? | ||
+ | : Caryn started evaluating | ||
+ | : Layout tight, how to fit optics, inside laser room? | ||
+ | * 2I spools? | ||
+ | : ME will order, need in time to a) weld capture solenoid, b) NEG coat | ||
+ | * New BPM's | ||
+ | : Design done, feedthroughs ordered, waiting on req to MDC | ||
+ | * Solenoid fixtures? | ||
+ | |||
+ | ;Magnets | ||
+ | * Dipole | ||
+ | : Emerson backed out, Milhous quoting round/square, Lakshimi working on Jay's AT design | ||
+ | * Soleonids | ||
+ | : Joe M. what is status? | ||
+ | * Quads | ||
+ | :Have 3 QW, Mike testing 2 spare QW quads (capture on welded cross) | ||
+ | * Correctors | ||
+ | : Joe G make tally | ||
+ | * Wien | ||
+ | : Technicoil getting ready to wind | ||
+ | * PSS Kicker | ||
+ | : Met w/ Jerry, Lakshimi working on upgraded kicker to move 200 keV beam 1cm @ 30 cm w < 200 mA (March 9 layout) | ||
+ | |||
+ | ;Orders | ||
+ | * Bellows - waiting on final count | ||
+ | * Right angle valves - we have 5 or 6, should be ok? | ||
+ | * Gun 10" flange - signed req for (2) | ||
+ | * BPM feedthroughs - ordered | ||
+ | * BPM cans - waiting on req to MDC | ||
;Controls | ;Controls | ||
* Chris, what cameras will you use, will they fit? | * Chris, what cameras will you use, will they fit? | ||
− | |||
* Mark/Dave, do you have a plan for 2500W solid state chopper amps? | * Mark/Dave, do you have a plan for 2500W solid state chopper amps? | ||
* Mark/Dave, do you have a plan for Brock prebuncher cavity/amp? | * Mark/Dave, do you have a plan for Brock prebuncher cavity/amp? | ||
− | * | + | * Omar, do you have BPM channel? |
+ | : Yes! | ||
;Modelers | ;Modelers | ||
Line 19: | Line 54: | ||
* Can a YAG go at the laser screen, I don't think so? | * Can a YAG go at the laser screen, I don't think so? | ||
* Is the beam envelope OK for ways we run spin rotators? | * Is the beam envelope OK for ways we run spin rotators? | ||
+ | : What are the currents and/or B's for the solenoids and quads? | ||
* What are the power levels for existing or Brock prebuncher cavities, for 130 or 200 keV locations? | * What are the power levels for existing or Brock prebuncher cavities, for 130 or 200 keV locations? | ||
* Is distance from MFG1I04A to upstream corrector far enough? or move MFG1I04A downstream, how far? | * Is distance from MFG1I04A to upstream corrector far enough? or move MFG1I04A downstream, how far? | ||
:Jay is running cases | :Jay is running cases | ||
* Is the corrector/bpm downstream A1 useful? | * Is the corrector/bpm downstream A1 useful? | ||
+ | |||
+ | ;Commissioning | ||
+ | * Plan for May gun work? |
Revision as of 06:08, 11 March 2020
- Mechanical
- What is the bellows type count, how may 3" and 3.5"?
- Chris, do you have all as-founds you need?
- Use C channel everywhere and move pedestals ok?
- Anthony says yes, do it
- Carlos, send Shaun Wien feedthrough p/n
- SS or Al brackets?
- Use Al, now all 7-3/4" girder to beam line, girder holes whereever imagine support
- NEG chambers
- Detail Y- 10" flange, NEG's here
- Flip DP for IP beam left, modify for new NEG's?
- Laser vacuum window?
- Caryn started evaluating
- Layout tight, how to fit optics, inside laser room?
- 2I spools?
- ME will order, need in time to a) weld capture solenoid, b) NEG coat
- New BPM's
- Design done, feedthroughs ordered, waiting on req to MDC
- Solenoid fixtures?
- Magnets
- Dipole
- Emerson backed out, Milhous quoting round/square, Lakshimi working on Jay's AT design
- Soleonids
- Joe M. what is status?
- Quads
- Have 3 QW, Mike testing 2 spare QW quads (capture on welded cross)
- Correctors
- Joe G make tally
- Wien
- Technicoil getting ready to wind
- PSS Kicker
- Met w/ Jerry, Lakshimi working on upgraded kicker to move 200 keV beam 1cm @ 30 cm w < 200 mA (March 9 layout)
- Orders
- Bellows - waiting on final count
- Right angle valves - we have 5 or 6, should be ok?
- Gun 10" flange - signed req for (2)
- BPM feedthroughs - ordered
- BPM cans - waiting on req to MDC
- Controls
- Chris, what cameras will you use, will they fit?
- Mark/Dave, do you have a plan for 2500W solid state chopper amps?
- Mark/Dave, do you have a plan for Brock prebuncher cavity/amp?
- Omar, do you have BPM channel?
- Yes!
- Modelers
- Is the March 9th layout ok?
- Is the harp location OK for solenoid scans?
- Should a viewer remain at the harp location, should this be a YAG?
- Where else should YAG's go?
- Can a YAG go at the laser screen, I don't think so?
- Is the beam envelope OK for ways we run spin rotators?
- What are the currents and/or B's for the solenoids and quads?
- What are the power levels for existing or Brock prebuncher cavities, for 130 or 200 keV locations?
- Is distance from MFG1I04A to upstream corrector far enough? or move MFG1I04A downstream, how far?
- Jay is running cases
- Is the corrector/bpm downstream A1 useful?
- Commissioning
- Plan for May gun work?