Difference between revisions of "2/26/21 - Bi-weekly meeting"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "; To-Do list from 2/12/21 # Joe - distance flange to beam center CEBAF vs UITF # Joe - copper ladder drawings if available, cooling spec, what would have to change to get it...")
 
Line 2: Line 2:
  
 
# Joe - distance flange to beam center CEBAF vs UITF
 
# Joe - distance flange to beam center CEBAF vs UITF
 +
* => working on this w/ Danny
 
# Joe - copper ladder drawings if available, cooling spec, what would have to change to get it installed in CEBAF or UITF
 
# Joe - copper ladder drawings if available, cooling spec, what would have to change to get it installed in CEBAF or UITF
 +
* => working on this w/ Danny
 
# Marcy - select gold targets
 
# Marcy - select gold targets
 
# Jim - poly diamond sandwich design sketches (how mount to single crystal, metal)
 
# Jim - poly diamond sandwich design sketches (how mount to single crystal, metal)
Line 9: Line 11:
 
# Riad - send Euclid the tech notes on asymmetry as function of data rate?
 
# Riad - send Euclid the tech notes on asymmetry as function of data rate?
 
# Joe - check if all gold, diamond, and phosphor can be round (no square ladder mounts needed)
 
# Joe - check if all gold, diamond, and phosphor can be round (no square ladder mounts needed)
 +
* Yes
 
# Andrei/Mike - could send Euclid the Hall A diamond data, also work w/Andrei on thermal after Euclid provides the ladder design (can do limiting case of all-radiative early)
 
# Andrei/Mike - could send Euclid the Hall A diamond data, also work w/Andrei on thermal after Euclid provides the ladder design (can do limiting case of all-radiative early)
 
# Biweekly with core (Eric, Andrei, Joe) and add others as needed, 30 minutes at 3pm Fri Eastern time
 
# Biweekly with core (Eric, Andrei, Joe) and add others as needed, 30 minutes at 3pm Fri Eastern time

Revision as of 16:12, 22 February 2021

To-Do list from 2/12/21
  1. Joe - distance flange to beam center CEBAF vs UITF
  • => working on this w/ Danny
  1. Joe - copper ladder drawings if available, cooling spec, what would have to change to get it installed in CEBAF or UITF
  • => working on this w/ Danny
  1. Marcy - select gold targets
  2. Jim - poly diamond sandwich design sketches (how mount to single crystal, metal)
  3. Joe/Marcy - get existing tunnel camera framed with central beam pixel on old ladder and not moved before June install
  4. Riad/Marcy - any tech note on thickness, statistics, target and beam scans?
  5. Riad - send Euclid the tech notes on asymmetry as function of data rate?
  6. Joe - check if all gold, diamond, and phosphor can be round (no square ladder mounts needed)
  • Yes
  1. Andrei/Mike - could send Euclid the Hall A diamond data, also work w/Andrei on thermal after Euclid provides the ladder design (can do limiting case of all-radiative early)
  2. Biweekly with core (Eric, Andrei, Joe) and add others as needed, 30 minutes at 3pm Fri Eastern time