; To-Do list from 2/12/21
 
; To-Do list from 2/12/21
  
# Joe - distance flange to beam center CEBAF vs UITF
+
* Joe - distance flange to beam center CEBAF vs UITF
* => working on this w/ Danny
+
** => working on this w/ Danny
# Joe - copper ladder drawings if available, cooling spec, what would have to change to get it installed in CEBAF or UITF
+
 
* => working on this w/ Danny
+
* Joe - copper ladder drawings if available, cooling spec, what would have to change to get it installed in CEBAF or UITF
# Marcy - select gold targets
+
** => working on this w/ Danny
# Jim - poly diamond sandwich design sketches (how mount to single crystal, metal)
+
 
# Joe/Marcy - get existing tunnel camera framed with central beam pixel on old ladder and not moved before June install
+
* Marcy - select gold targets
# Riad/Marcy - any tech note on thickness, statistics, target and beam scans?
+
 
# Riad - send Euclid the tech notes on asymmetry as function of data rate?
+
* Jim - poly diamond sandwich design sketches (how mount to single crystal, metal)
# Joe - check if all gold, diamond, and phosphor can be round (no square ladder mounts needed)
+
 
* Yes
+
* Joe/Marcy - get existing tunnel camera framed with central beam pixel on old ladder and not moved before June install
# Andrei/Mike - could send Euclid the Hall A diamond data, also work w/Andrei on thermal after Euclid provides the ladder design (can do limiting case of all-radiative early)
+
 
# Biweekly with core (Eric, Andrei, Joe) and add others as needed, 30 minutes at 3pm Fri Eastern time
+
* Riad/Marcy - any tech note on thickness, statistics, target and beam scans?
 +
 
 +
* Riad - send Euclid the tech notes on asymmetry as function of data rate?
 +
 
 +
* Joe - check if all gold, diamond, and phosphor can be round (no square ladder mounts needed)
 +
** Yes
 +
 
 +
* Andrei/Mike - could send Euclid the Hall A diamond data, also work w/Andrei on thermal after Euclid provides the ladder design (can do limiting case of all-radiative early)
 +
 
 +
* Biweekly with core (Eric, Andrei, Joe) and add others as needed, 30 minutes at 3pm Fri Eastern time

Revision as of 16:13, 22 February 2021

To-Do list from 2/12/21
  • Joe - distance flange to beam center CEBAF vs UITF
    • => working on this w/ Danny
  • Joe - copper ladder drawings if available, cooling spec, what would have to change to get it installed in CEBAF or UITF
    • => working on this w/ Danny
  • Marcy - select gold targets
  • Jim - poly diamond sandwich design sketches (how mount to single crystal, metal)
  • Joe/Marcy - get existing tunnel camera framed with central beam pixel on old ladder and not moved before June install
  • Riad/Marcy - any tech note on thickness, statistics, target and beam scans?
  • Riad - send Euclid the tech notes on asymmetry as function of data rate?
  • Joe - check if all gold, diamond, and phosphor can be round (no square ladder mounts needed)
    • Yes
  • Andrei/Mike - could send Euclid the Hall A diamond data, also work w/Andrei on thermal after Euclid provides the ladder design (can do limiting case of all-radiative early)
  • Biweekly with core (Eric, Andrei, Joe) and add others as needed, 30 minutes at 3pm Fri Eastern time