* Upgrade Glassman Gun PSS interlock chassis (Carlos)
 
* Upgrade Glassman Gun PSS interlock chassis (Carlos)
 +
* Add vacuum interlock to HV supply (Scott)
  
  
Line 8: Line 9:
  
  
* Prep Chamber: (Mamun)
+
* Prep Chamber: (Mamun)- '''''Completed''''' [https://logbooks.jlab.org/entry/3869663]
 
** Fix Transverse Manipulator
 
** Fix Transverse Manipulator
 
** Fix Sb boat
 
** Fix Sb boat
 
** Clean Sb pellets off chamber
 
** Clean Sb pellets off chamber
 
** Clean/check Bottom Heater
 
** Clean/check Bottom Heater
** Ad Cs for Robust Photocathode research
+
** Add Cs for Robust Photocathode research
 
** Clean/replace windows
 
** Clean/replace windows
** Add pucks with Nb and GaAs (Robust Photocathode) substrates
+
** Add pucks with Moly and GaAs (Robust Photocathode) substrates
  
  
Line 22: Line 23:
 
** Replace Anode
 
** Replace Anode
 
** Replace Pierce geometry
 
** Replace Pierce geometry
** Upgrade anode HV bias feed-through to 5/10 (?) kV
+
** Upgrade anode HV bias feed-through to 10 kV
  
  

Latest revision as of 09:47, 12 April 2021

  • Upgrade Glassman Gun PSS interlock chassis (Carlos)
  • Add vacuum interlock to HV supply (Scott)


  • Beamline - no bake of beamline: (Mamun and Bubba)
    • Replace YAG screens on Viewers 1,2 and 3
    • Replace leaky right-angle valve
    • Remove Deflecting Cavity and move TE_011 Cavity in its place


  • Prep Chamber: (Mamun)- Completed [1]
    • Fix Transverse Manipulator
    • Fix Sb boat
    • Clean Sb pellets off chamber
    • Clean/check Bottom Heater
    • Add Cs for Robust Photocathode research
    • Clean/replace windows
    • Add pucks with Moly and GaAs (Robust Photocathode) substrates


  • Gun HV Chamber: (Carlos)
    • Clean anode, cathode front
    • Replace Anode
    • Replace Pierce geometry
    • Upgrade anode HV bias feed-through to 10 kV


  • Laser: (Shukui)
    • Re-install 500 MHz green fiber laser
    • Install new pulse laser