'''Open, complete, re-scheduled statuses updated 5/6/21'''
+
'''Open, complete, re-scheduled statuses updated 5/7/21'''
  
 
;AIPINJ
 
;AIPINJ
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22402 Add UHV ion pumps to VBV0I02 interlock chain]
 
 
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/22311 Insertable Upgrade on iocin3 for viewers, faraday cup, and yag viewer]
 
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/22311 Insertable Upgrade on iocin3 for viewers, faraday cup, and yag viewer]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22151 AIPINJ: temporary 5D beam line removal]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22151 AIPINJ: temporary 5D beam line removal]
Line 12: Line 11:
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics]
* '''Open''' [http://devweb.acc20275.jlab.org/CSUEApps/atlis/task/17932 "SAD 2020" Injector Harp System - interface controls upgrade]
 
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21431 Install and Commission Wien filter Power Supplies]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21431 Install and Commission Wien filter Power Supplies]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21198 Survey support for Injector Upgrade]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21198 Survey support for Injector Upgrade]
Line 18: Line 16:
 
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/20275 Perform Installation work for newly added Injector bpm during 2020 SAD]
 
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/20275 Perform Installation work for newly added Injector bpm during 2020 SAD]
  
 
+
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 "SAD 2020" Injector Harp System - interface controls upgrade]
 
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22201 STAC5 A1 Aperture Epics Controls]
 
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22201 STAC5 A1 Aperture Epics Controls]
 
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1273 Testing Wien HV Controls at UITF]
 
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1273 Testing Wien HV Controls at UITF]
Line 29: Line 27:
 
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21211 Install Lifting Plates in Ijn. Ceiling to Support 1/4 CM Swap]
 
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21211 Install Lifting Plates in Ijn. Ceiling to Support 1/4 CM Swap]
 
* '''Complete''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/22270 5D cold cathode gauge repositioning]
 
* '''Complete''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/22270 5D cold cathode gauge repositioning]
 
+
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22402 Add UHV ion pumps to VBV0I02 interlock chain]
  
 
;CIS SAD Tasks
 
;CIS SAD Tasks
Line 54: Line 52:
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20415 I&C Injector Camac to Vme and camera upgrade]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20415 I&C Injector Camac to Vme and camera upgrade]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17247 I&C Upgrade harps to PC104]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17247 I&C Upgrade harps to PC104]
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21331 I&C Upgrade existing ItoV System with ItoV VME cards]
 
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/18471 I&C Accelerator network re-survey]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/18471 I&C Accelerator network re-survey]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21334 FAC Tunnel Fire Alarm and Suppression Replacement]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21334 FAC Tunnel Fire Alarm and Suppression Replacement]
Line 73: Line 70:
  
  
 +
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22371 Connect bpm cables inside injector Laser Yellow Box *revised]
 
* '''Complete''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21882 B53 (INJ SB) Panelboard PM]
 
* '''Complete''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21882 B53 (INJ SB) Panelboard PM]
 
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21981 iocin1 - VME crate replacement]
 
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21981 iocin1 - VME crate replacement]
Line 81: Line 79:
  
 
* '''Rescheduled''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21376 Injector (prebuncher, buncher and choppers)- LLRF systems upgrade to 3.0 version]
 
* '''Rescheduled''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21376 Injector (prebuncher, buncher and choppers)- LLRF systems upgrade to 3.0 version]
 +
* '''Rescheduled''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21331 I&C Upgrade existing ItoV System with ItoV VME cards]

Revision as of 19:11, 7 May 2021

Open, complete, re-scheduled statuses updated 5/7/21

AIPINJ
CIS SAD Tasks



Injector Related SAD Tasks