Difference between revisions of "2021-05-12"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
 
 
(12 intermediate revisions by the same user not shown)
Line 20: Line 20:
 
# Commission new beam line and execute experiment
 
# Commission new beam line and execute experiment
  
Long Term Schedule (McCaughan) [[Media:Ww-longterm.5.4.21.pdf|Strawman]]
+
Long Term Schedule (McCaughan) [[Media:Ww-longterm.5.12.21.pdf|Gantt]]
  
 
==== <u>New items for discussion:</u> ====
 
==== <u>New items for discussion:</u> ====
* Short term schedule update:
+
<u>Short term schedule update:</u><br>
*This week:  
+
<u>This week:</u>
*#*Component disconnects (Mostly complete)
+
*Component disconnects (Complete on elevated line)
*#*Stage larger table for beam line prep behind MeV dump (Complete)
+
*Post 2-d schematic on beam line to guide installation (Completed and posted)
*#*Vent elevated line for component removal (Complete)
+
*Install more brackets and flange supports on 80/20 (BPM locations; need measurements...) (Completed)
*#*Pull components from elevated line (In progress) IDLM601 dump, FC4, ITVM904, ITVM905, and VIPM904,5a,and 5b removed & 4 5/8" BPMs.
+
*PEPPo magnet/Solenoid installed on 80/20 (Completed)
*#*Diagnose Chopper slit (Complete - gear box issue; on A5 controls/STAC5 now. Thanks to Scott!)
+
*Gun work progressing well:
*#*Target interlock completed for beam mode with SCAM (Thanks to all involved!)
+
*# [https://logbooks.jlab.org/entry/3876061 Schneedle replaced]
*#*Inventory Faye's old office for materials (Completed by John)
+
*# [https://logbooks.jlab.org/entry/3876599 Scheedle, anode, and cathode aligned]
*#*Shaun iterating on design to add additional viewer per Yan/Matt's request
+
*#[https://wiki.jlab.org/ciswiki/index.php/Spring_2021_-_Rebuilding_Photogun Gun rebuild schedule]
*#*Do we have fluorescing screen on hand for behind samples? (Yes)
+
*#Minor SF6 leak in HV chamber identified; repair later...
*#*Parts for install; give them to Teena for UHV cleaning... (1st load completed; target vessels as well as many conflats/reducers being cleaned now...)
+
*Vacuum work / Beam line assembly Fridays starting at 10:30 am for any who want to participate
*#*Viewer screens require alignment (Matt rough aligned w turnbuckle)
 
*#*Add table for vacuum work staging (completed)
 
*#*Finish pillaging elevated line; get Shaun list of required transitions.(Completed)
 
*#*Gasket purchase: Dunniway Stock Room or Kurt Lesker (silver plated, 2.75", 4.5" and 4 5/8", 30 ea. plus blank 2.75" for the conductance limiting aperture, pack of 10) - Copy from Matt/Marcy's req queue.(Completed)
 
  
*Next Week:  
+
<u>Next Week:</u>
*#*Pull Heliax from Sprectrum analyzer/Control room >> Buncher
+
* Alignment today (Wed.) or Friday of big pieces (solenoid, viewer crosses, FC4); please avoid the area under survey.
*#*Unistrut mounting for cables / gas bottle rack - Neal will do when available
+
* Get area up to transition after solenoid under vacuum. Install valve/bellow/bpm.
*#*4th terminal system in Control room under assembly/rebuild
+
* Install 4 5/8" BPMs after insertion measurements completed
*#*Post 2-d schematic on beam line to guide installation
+
* Break vacuum in FC3 region
*#*Install more brackets and flange supports on 80/20 (BPM locations; need measurements...)
+
 
*#*PEPPo magnet/Solenoid progress? Under test...
+
<u>2 weeks:</u>
*#*Ready to install Al base plates for FC3 region rework as well as solenoid stand. Solenoid plate with magnet; FC3 plate awaiting machining - need still a few weeks off.
+
*Roof tiles off for HDIce (5/24), Dilution refrigerator craned out (5/25), and then roof tiles replaced again (5/26). SRF (Fisher) will be relocating material on roof to accommodate.
*#*Build 80/20 support structure; add mounting plates/brackets/etc. (Complete under solenoid; Pb table still needs construction)
+
*Build 80/20 support structure; add mounting plates/brackets/etc. (Pb table components awaiting delivery)
*#*Gun work continues... (Alignment work in progress...) [https://wiki.jlab.org/ciswiki/index.php/Spring_2021_-_Rebuilding_Photogun Gun rebuild schedule]
+
*Pull Heliax from Sprectrum analyzer/Control room >> Buncher
*#*Screen Material / intensifier on hand; have holder.
+
*Unistrut mounting for cables / gas bottle rack - Neal will do when available
*#*Vacuum work / Beam line assembly Fridays starting at 10:30 am for any who want to participate
+
*4th terminal system in Control room under assembly/rebuild
*#*[https://wiki.jlab.org/ciswiki/index.php/To-do_list Items from To-do list...]
+
*Ready to install Al base plates for FC3 region rework as well as solenoid stand. FC3 plate awaiting machining.
* Engineering
+
*[https://wiki.jlab.org/ciswiki/index.php/To-do_list Items from To-do list...]
*#Insertion measurements in progress on 4 5/8" BPMs
+
 
* Other business
+
<u>Engineering</u>
 +
*Insertion measurements in progress on 4 5/8" BPMs
 +
 
 +
Other business
  
 
==== <u>Reports on Open Action Items:</u> ====
 
==== <u>Reports on Open Action Items:</u> ====
*Action Items:
+
Action Items:
*# Formal run plan
+
*Formal run plan (McCaughan)
  
 
[[Meeting_minutes | Back to Main Meeting Minutes Page]]
 
[[Meeting_minutes | Back to Main Meeting Minutes Page]]

Latest revision as of 07:55, 12 May 2021

Meeting Information

Connecting

To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/946721076.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 946721076.
  3. To join via phone, use one of the following numbers and the Conference ID: 946721076.
    • Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Agenda

Schedule

Rough timetable:

  1. CMTF tests with C75-1 (late-March - early-June).
  2. UITF beam line modification
  3. Supplementary Shielding Installation: Mid-June
  4. Beamline Commissioning / Test Plans / Shielding Verification
  5. 7/26/21 Start Hot Check-out
  6. Commission new beam line and execute experiment

Long Term Schedule (McCaughan) Gantt

New items for discussion:

Short term schedule update:
This week:

  • Component disconnects (Complete on elevated line)
  • Post 2-d schematic on beam line to guide installation (Completed and posted)
  • Install more brackets and flange supports on 80/20 (BPM locations; need measurements...) (Completed)
  • PEPPo magnet/Solenoid installed on 80/20 (Completed)
  • Gun work progressing well:
    1. Schneedle replaced
    2. Scheedle, anode, and cathode aligned
    3. Gun rebuild schedule
    4. Minor SF6 leak in HV chamber identified; repair later...
  • Vacuum work / Beam line assembly Fridays starting at 10:30 am for any who want to participate

Next Week:

  • Alignment today (Wed.) or Friday of big pieces (solenoid, viewer crosses, FC4); please avoid the area under survey.
  • Get area up to transition after solenoid under vacuum. Install valve/bellow/bpm.
  • Install 4 5/8" BPMs after insertion measurements completed
  • Break vacuum in FC3 region

2 weeks:

  • Roof tiles off for HDIce (5/24), Dilution refrigerator craned out (5/25), and then roof tiles replaced again (5/26). SRF (Fisher) will be relocating material on roof to accommodate.
  • Build 80/20 support structure; add mounting plates/brackets/etc. (Pb table components awaiting delivery)
  • Pull Heliax from Sprectrum analyzer/Control room >> Buncher
  • Unistrut mounting for cables / gas bottle rack - Neal will do when available
  • 4th terminal system in Control room under assembly/rebuild
  • Ready to install Al base plates for FC3 region rework as well as solenoid stand. FC3 plate awaiting machining.
  • Items from To-do list...

Engineering

  • Insertion measurements in progress on 4 5/8" BPMs

Other business

Reports on Open Action Items:

Action Items:

  • Formal run plan (McCaughan)

Back to Main Meeting Minutes Page