Difference between revisions of "UITC users"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
The following are a list of all of the experiments which have been performed to date in the Upgrade Injector Test Facility:
 
The following are a list of all of the experiments which have been performed to date in the Upgrade Injector Test Facility:
 +
 +
[https://www.jlab.org/ehs/ehsmanual/manual/3120.html ES&H Manual Ch:3120 The CEBAF Experiment Review Process]
 +
[https://www.jlab.org/ehs/ehsmanual/manual/3130.html ES&H Manual Ch:3130 Accelerator Experiment Safety Review Process]
 +
  
 
Present Experiment on the floor:
 
Present Experiment on the floor:

Revision as of 13:58, 27 July 2021

The following are a list of all of the experiments which have been performed to date in the Upgrade Injector Test Facility:

ES&H Manual Ch:3120 The CEBAF Experiment Review Process ES&H Manual Ch:3130 Accelerator Experiment Safety Review Process


Present Experiment on the floor:

E2020-001 Wastewater Irraditiation LDRD with HRSD

Past Experiments:

Enn-nn-001 HDIce