Difference between revisions of "UITC users"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
The following are a list of all of the experiments which have been performed to date in the Upgrade Injector Test Facility: | The following are a list of all of the experiments which have been performed to date in the Upgrade Injector Test Facility: | ||
− | [https://www.jlab.org/ehs/ehsmanual/manual/3120.html ES&H Manual Ch:3120 The CEBAF Experiment Review Process] | + | [https://www.jlab.org/ehs/ehsmanual/manual/3120.html ES&H Manual Ch:3120 The CEBAF Experiment Review Process]<br /> |
[https://www.jlab.org/ehs/ehsmanual/manual/3130.html ES&H Manual Ch:3130 Accelerator Experiment Safety Review Process] | [https://www.jlab.org/ehs/ehsmanual/manual/3130.html ES&H Manual Ch:3130 Accelerator Experiment Safety Review Process] | ||
Revision as of 13:58, 27 July 2021
The following are a list of all of the experiments which have been performed to date in the Upgrade Injector Test Facility:
ES&H Manual Ch:3120 The CEBAF Experiment Review Process
ES&H Manual Ch:3130 Accelerator Experiment Safety Review Process
Present Experiment on the floor:
E2020-001 Wastewater Irraditiation LDRD with HRSD
Past Experiments: