Difference between revisions of "Phase 2"
Jump to navigation
Jump to search
Line 12: | Line 12: | ||
==ATLIS Tasks== | ==ATLIS Tasks== | ||
− | * Install harp | + | * Install harp, remove top-hat from viewer |
* Re-make A2 joint | * Re-make A2 joint | ||
* Take advantage to install new valve downstream chopper? | * Take advantage to install new valve downstream chopper? | ||
+ | * Return gold target ladder, w/ larger nipple, original STAC5 | ||
* Replace both Wien 20A SCE with lower noise power supplies | * Replace both Wien 20A SCE with lower noise power supplies | ||
* Install Lakshmi's DR dipole | * Install Lakshmi's DR dipole | ||
− | * | + | * Install/test new kicker |
+ | * Test mode-locked laser | ||
* Install gun which reaches 200 kV reliably w/o field emission | * Install gun which reaches 200 kV reliably w/o field emission | ||
* Requested to Steve brighter lights from laser room to gate (like we have by gun) | * Requested to Steve brighter lights from laser room to gate (like we have by gun) |
Revision as of 05:57, 18 August 2021
Recent Updates
Planning, planning, planning...
Major Phase 2 Beamline Components
ATLIS Tasks
- Install harp, remove top-hat from viewer
- Re-make A2 joint
- Take advantage to install new valve downstream chopper?
- Return gold target ladder, w/ larger nipple, original STAC5
- Replace both Wien 20A SCE with lower noise power supplies
- Install Lakshmi's DR dipole
- Install/test new kicker
- Test mode-locked laser
- Install gun which reaches 200 kV reliably w/o field emission
- Requested to Steve brighter lights from laser room to gate (like we have by gun)