===Phase 1 Region===
 
* Install harp, remove top-hat from viewer
 
* Install harp, remove top-hat from viewer
 
* Re-make A2 joint
 
* Re-make A2 joint
* Take advantage to install new valve downstream chopper?
 
 
* Return gold target ladder, w/ larger nipple, original STAC5
 
* Return gold target ladder, w/ larger nipple, original STAC5
 
* Replace both Wien 20A SCE with lower noise power supplies
 
* Replace both Wien 20A SCE with lower noise power supplies
Line 21: Line 21:
 
* Test mode-locked laser
 
* Test mode-locked laser
 
* Install gun which reaches 200 kV reliably w/o field emission
 
* Install gun which reaches 200 kV reliably w/o field emission
 +
 +
===Phase 2 Region===
 
* Requested to Steve brighter lights from laser room to gate (like we have by gun)
 
* Requested to Steve brighter lights from laser room to gate (like we have by gun)
 +
* Take advantage of harp/A2 vacuum work to install new solenoid + valve downstream chopper?

Revision as of 07:42, 18 August 2021

Recent Updates

Planning, planning, planning...

Major Phase 2 Beamline Components

SRF Booster
media:parts list old and new phase2 beamline.xls

ATLIS Tasks

Phase 1 Region

  • Install harp, remove top-hat from viewer
  • Re-make A2 joint
  • Return gold target ladder, w/ larger nipple, original STAC5
  • Replace both Wien 20A SCE with lower noise power supplies
  • Install Lakshmi's DR dipole
  • Install/test new kicker
  • Test mode-locked laser
  • Install gun which reaches 200 kV reliably w/o field emission

Phase 2 Region

  • Requested to Steve brighter lights from laser room to gate (like we have by gun)
  • Take advantage of harp/A2 vacuum work to install new solenoid + valve downstream chopper?