Difference between revisions of "Phase 2"
Jump to navigation
Jump to search
Line 12: | Line 12: | ||
==2022 Winter SAD ATLIS Tasks== | ==2022 Winter SAD ATLIS Tasks== | ||
− | + | ; | |
− | * Install | + | Phase 1 Region |
− | * | + | * (~everyone) Install 200 kV w/o field emission |
− | * Replace | + | * (Lakshmi) Replace DR dipole => PO written week of Aug 30 for new DM at CEBAF, UITF and 2 spare coils |
− | * | + | * (Sarin/Riad) Replace noisy Wien 20A SCE => |
− | * | + | * (Phil) Repair leaky PCUP LCW fitting |
− | * Install | + | * (Marcy) Remake A2 joint |
+ | * (Marcy) Replace harp | ||
+ | * (Jerry) Install & test 200 kV kicker | ||
− | + | ;Phase 2 Region | |
− | * | + | * (Matt) Possibly install solenoid/valve downstream of chopper => MMF mapping solenoids in Sep. Do we have 2-3/4" pneumatic beam line valve? |
− | * | + | * (FM) Install bright lighting => Walked area with FM. Waiting for follow-up. |
===Other=== | ===Other=== |
Revision as of 09:06, 9 September 2021
Recent Updates
Planning, planning, planning...
Major Phase 2 Beamline Components
2022 Winter SAD ATLIS Tasks
Phase 1 Region
- (~everyone) Install 200 kV w/o field emission
- (Lakshmi) Replace DR dipole => PO written week of Aug 30 for new DM at CEBAF, UITF and 2 spare coils
- (Sarin/Riad) Replace noisy Wien 20A SCE =>
- (Phil) Repair leaky PCUP LCW fitting
- (Marcy) Remake A2 joint
- (Marcy) Replace harp
- (Jerry) Install & test 200 kV kicker
- Phase 2 Region
- (Matt) Possibly install solenoid/valve downstream of chopper => MMF mapping solenoids in Sep. Do we have 2-3/4" pneumatic beam line valve?
- (FM) Install bright lighting => Walked area with FM. Waiting for follow-up.
Other
- Test mode-locked laser
- Return gold target ladder, w/ larger nipple, original STAC5
- Store tunnel HV cables nicely, like we do now at UITF