Difference between revisions of "Facility Overview"
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
*[https://logbooks.jlab.org/entry/3906224| Commissioning Survey to Wastewater Target (9/16/21)] | *[https://logbooks.jlab.org/entry/3906224| Commissioning Survey to Wastewater Target (9/16/21)] | ||
*[https://logbooks.jlab.org/entry/3899691| 150nA to FC3/4 @ 9.5 MeV (9/1/21)] | *[https://logbooks.jlab.org/entry/3899691| 150nA to FC3/4 @ 9.5 MeV (9/1/21)] | ||
− | *[https://logbooks.jlab.org/entry/3826561|10uA @ 5.16 MeV (8/13/20)] | + | *[https://logbooks.jlab.org/entry/3826561| 10uA @ 5.16 MeV (8/13/20)] |
*[https://logbooks.jlab.org/entry/3825053|4 MeV Break point measurements (8/11/20)] | *[https://logbooks.jlab.org/entry/3825053|4 MeV Break point measurements (8/11/20)] | ||
*[https://logbooks.jlab.org/entry/3822177|2 MeV Break point measurements (8/7/20)] | *[https://logbooks.jlab.org/entry/3822177|2 MeV Break point measurements (8/7/20)] |
Revision as of 17:41, 16 September 2021
Summary
Radiological Data: 'Break Point Measurements / Shielding Validation'
- Commissioning Survey to Wastewater Target (9/16/21)
- 150nA to FC3/4 @ 9.5 MeV (9/1/21)
- 10uA @ 5.16 MeV (8/13/20)
- MeV Break point measurements (8/11/20)
- MeV Break point measurements (8/7/20)
'Radcon Checklists'
- Checklist (8/20/21) - Wastewater Experiment
- Cechklist (3/16/21)
- Checklist(3/2/21) - HDIce run extension
- Checklist (1/24/21)
- Checklist (10/26/20)
- run '0' checklist (7/20/20)
- Commissioning Checklist