Difference between revisions of "Facility Overview"
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
*[https://logbooks.jlab.org/entry/3825053| 4 MeV Break point measurements (8/11/20)] | *[https://logbooks.jlab.org/entry/3825053| 4 MeV Break point measurements (8/11/20)] | ||
*[https://logbooks.jlab.org/entry/3822177| 2 MeV Break point measurements (8/7/20)] | *[https://logbooks.jlab.org/entry/3822177| 2 MeV Break point measurements (8/7/20)] | ||
+ | *[https://logbooks.jlab.org/entry/3801266| 200 keV 10uA break points(cont.) (3/10/20)] | ||
+ | *[https://logbooks.jlab.org/entry/3801256| 200 keV 10uA break points (3/10/20)] | ||
+ | |||
Revision as of 18:10, 5 October 2021
Summary
Radiological Data: 'Break Point Measurements / Shielding Validation'
- Commissioning Survey to Wastewater Target (9/16/21)
- 150nA to FC3/4 @ 9.5 MeV (9/1/21)
- FC3/4 (9/1/21)
- 100nA surveys (9/1/21)
- 10uA @ 5.16 MeV (8/13/20)
- 4 MeV Break point measurements (8/11/20)
- 2 MeV Break point measurements (8/7/20)
- 200 keV 10uA break points(cont.) (3/10/20)
- 200 keV 10uA break points (3/10/20)
'Radcon Checklists'
- RCG Checklist (8/20/21) - Wastewater Experiment
- RCG Checklist (3/16/21)
- RCG Checklist(3/2/21) - HDIce run extension
- RCG Checklist (1/24/21)
- RCG Checklist (10/26/20)
- MeV run '0' checklist (7/20/20)
- 12/19/19 Commissioning Checklist
BCM Calibration: Linearity Test(8/25/21)
Vacuum: Valve Configuration
Gun:
Vibrations:
- Powers (9/8/21)
- Owens Spectra (8/25/21) - Owens work Nov. 2020