==Agenda==
+
==ME - First installation==
 +
* remove ~4' pipe in straight passthrough
 +
* add reducer + ceramic break + bubble radiator
 +
* add MIT bates magnet + Mott detector on the support table
 +
* realistic time frame for DAQ
  
==First installation==
+
==ME - Second installation==
** remove ~4' pipe in straight passthrough
+
* Replace MIT magnet with Lakshmi's magnet
** add reducer + ceramic break + bubble radiator
+
* Replace Mott detector with Eric's detector
** add MIT bates magnet + Mott detector on the support table
 
** realistic time frame for DAQ
 
  
==Second installation==
+
==Updates & Discussion==
** Replace MIT magnet with Lakshmi's magnet
 
** Replace Mott detector with Eric's detector
 

Revision as of 15:07, 2 February 2022

ME - First installation

  • remove ~4' pipe in straight passthrough
  • add reducer + ceramic break + bubble radiator
  • add MIT bates magnet + Mott detector on the support table
  • realistic time frame for DAQ

ME - Second installation

  • Replace MIT magnet with Lakshmi's magnet
  • Replace Mott detector with Eric's detector

Updates & Discussion