Difference between revisions of "Meeting 2/3/22 - COMTRA"
Jump to navigation
Jump to search
(Created page with "==Agenda== ==First installation== ** remove ~4' pipe in straight passthrough ** add reducer + ceramic break + bubble radiator ** add MIT bates magnet + Mott detector on the s...") |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | |||
− | |||
==First installation== | ==First installation== | ||
− | + | * remove ~4' pipe in straight passthrough | |
− | + | * add reducer + ceramic break + bubble radiator | |
− | + | * add MIT bates magnet + Mott detector on the support table | |
− | + | * realistic time frame for DAQ | |
==Second installation== | ==Second installation== | ||
− | + | * Replace MIT magnet with Lakshmi's magnet | |
− | + | * Replace Mott detector with Eric's detector | |
+ | |||
+ | ==Updates & Discussion== | ||
+ | * Fabricate (2) 6mm Cu radiators | ||
+ | * Geant4 model for Greg | ||
+ | * Detector specs/status | ||
+ | * Magnet design/scope |
Latest revision as of 15:14, 2 February 2022
First installation
- remove ~4' pipe in straight passthrough
- add reducer + ceramic break + bubble radiator
- add MIT bates magnet + Mott detector on the support table
- realistic time frame for DAQ
Second installation
- Replace MIT magnet with Lakshmi's magnet
- Replace Mott detector with Eric's detector
Updates & Discussion
- Fabricate (2) 6mm Cu radiators
- Geant4 model for Greg
- Detector specs/status
- Magnet design/scope