Difference between revisions of "Meeting 2/10/22 - COMTRA"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "==First installation== * Radiator + ceramic in TL-1137, MIT polarized target + detector removed, survey then to TL https://logbooks.jlab.org/entry/3984465 * ME layout ==DAQ s...")
 
Line 4: Line 4:
  
 
==DAQ system discussion==
 
==DAQ system discussion==
 +
* Bryan/Chris
  
 
==Geant4 model discussion==
 
==Geant4 model discussion==
 
+
* Erice/Greg
 
 
=From Last meeting=
 
 
 
==First installation==
 
* remove ~4' pipe in straight passthrough
 
* add reducer + ceramic break + bubble radiator
 
* add MIT bates magnet + Mott detector on the support table
 
* realistic time frame for DAQ
 
  
 
==Second installation==
 
==Second installation==
* Replace MIT magnet with Lakshmi's magnet
 
* Replace Mott detector with Eric's detector
 
 
==Updates & Discussion==
 
 
* Fabricate (2) 6mm Cu radiators
 
* Fabricate (2) 6mm Cu radiators
* Geant4 model for Greg
 
 
* Detector  specs/status
 
* Detector  specs/status
 
* Magnet design/scope
 
* Magnet design/scope

Revision as of 08:57, 10 February 2022

First installation

DAQ system discussion

  • Bryan/Chris

Geant4 model discussion

  • Erice/Greg

Second installation

  • Fabricate (2) 6mm Cu radiators
  • Detector specs/status
  • Magnet design/scope