Difference between revisions of "April 13, 2022 - HV chamber layout for installation in CEBAF"
Jump to navigation
Jump to search
(Created page with "==Agenda== '''Critical path action items''' # Define if anode tube will be permanently at ground, or will be electrically isolated by April 13 # Verify HV chamber dimensions...") |
|||
(10 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
'''Critical path action items''' | '''Critical path action items''' | ||
− | # | + | # Let's make two version of anode tube: |
+ | #* One version will be permanently at ground (no Macor spacer, longer tube to make up spacer length 0.25 inches) | ||
+ | #* The second version will be electrically isolated as originally planned with Macor spacer and ceramic bushings | ||
+ | # The anode DS flange design will be based on the flange design from Injector Phase 1 (drawing ending in 0101, see below), but with two feedthrough ports. | ||
+ | #*Marcy, Joe mentioned installing this flange in the injector was a challenge: the ports gets in the way for assembly? How would having two ports affect this? Is there a better way to place them? See pictures below. | ||
# Verify HV chamber dimensions | # Verify HV chamber dimensions | ||
#*Shaun: is this needed for defining anode tube length? | #*Shaun: is this needed for defining anode tube length? | ||
− | #*Do you have HV chamber prints from | + | #*Do you have HV chamber prints from Lesker? |
#*Do you need S&A to measure HV chamber? | #*Do you need S&A to measure HV chamber? | ||
− | # Marcy, what are your conclusions on the HV chamber vacuum? | + | # Vacuum, |
+ | #*Marcy, what are your conclusions on the HV chamber vacuum? | ||
+ | #*Do you have all the measurements for Shaun to start the NEG drawings? | ||
# Layout for CEBAF installation | # Layout for CEBAF installation | ||
#*The plan is to focus on layout for installing in CEBAF using DS anode flange design from Injector Phase 1 (drawing ending in 0101, see below). It is critical to define this flange by the end of April so that it can be fabricated, and vacuum degassed. | #*The plan is to focus on layout for installing in CEBAF using DS anode flange design from Injector Phase 1 (drawing ending in 0101, see below). It is critical to define this flange by the end of April so that it can be fabricated, and vacuum degassed. | ||
− | |||
+ | '''Useful documents''' | ||
+ | * [[Anode flange prints and pictures]] | ||
+ | *[[Media:CIS-ASY-R30-3 schedule updateed April 12 2022.xlsx]] | ||
+ | *[[Media:14" HV chamber CEBAF injector vacuum piping dimensions.pptx]] | ||
− | *[https://jlab-org.zoomgov.com/j/ | + | '''Updates''' |
− | + | * C. Would has talked to Shaun about doing "as founds" on the HV chamber. | |
− | + | * Marcy reports that she is nearing the collection data and expect to have the HV chamber ready for venting by the end of this week | |
+ | |||
+ | |||
+ | *[https://jlab-org.zoomgov.com/j/16121791631 zoom meeting link] | ||
+ | *Meeting ID: 161 2179 1631 | ||
* [https://wiki.jlab.org/ciswiki/index.php/Update_meetings Back to Update Meetings] | * [https://wiki.jlab.org/ciswiki/index.php/Update_meetings Back to Update Meetings] |
Latest revision as of 08:58, 13 April 2022
Agenda
Critical path action items
- Let's make two version of anode tube:
- One version will be permanently at ground (no Macor spacer, longer tube to make up spacer length 0.25 inches)
- The second version will be electrically isolated as originally planned with Macor spacer and ceramic bushings
- The anode DS flange design will be based on the flange design from Injector Phase 1 (drawing ending in 0101, see below), but with two feedthrough ports.
- Marcy, Joe mentioned installing this flange in the injector was a challenge: the ports gets in the way for assembly? How would having two ports affect this? Is there a better way to place them? See pictures below.
- Verify HV chamber dimensions
- Shaun: is this needed for defining anode tube length?
- Do you have HV chamber prints from Lesker?
- Do you need S&A to measure HV chamber?
- Vacuum,
- Marcy, what are your conclusions on the HV chamber vacuum?
- Do you have all the measurements for Shaun to start the NEG drawings?
- Layout for CEBAF installation
- The plan is to focus on layout for installing in CEBAF using DS anode flange design from Injector Phase 1 (drawing ending in 0101, see below). It is critical to define this flange by the end of April so that it can be fabricated, and vacuum degassed.
Useful documents
- Anode flange prints and pictures
- Media:CIS-ASY-R30-3 schedule updateed April 12 2022.xlsx
- Media:14" HV chamber CEBAF injector vacuum piping dimensions.pptx
Updates
- C. Would has talked to Shaun about doing "as founds" on the HV chamber.
- Marcy reports that she is nearing the collection data and expect to have the HV chamber ready for venting by the end of this week
- zoom meeting link
- Meeting ID: 161 2179 1631