Difference between revisions of "UITF Notes"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
* Verify optics setup for HKDL | * Verify optics setup for HKDL | ||
* Ascertain the true frequency of the aliased GMES peak. Can the 105 kHz peak be the same that was 692 Hz in the last run? | * Ascertain the true frequency of the aliased GMES peak. Can the 105 kHz peak be the same that was 692 Hz in the last run? | ||
+ | * Buncher scan at 2-cell=2.5, 7-cell=9.0, both crested | ||
+ | ** 6.2: IHAM703.07242022_15:16:35 0.6895 | ||
+ | ** 6.1: IHAM703.07242022_15:18:24 0.5668 | ||
+ | ** 6.0: IHAM703.07242022_15:19:35 0.4742 | ||
+ | ** 5.9: IHAM703.07242022_15:20:50 0.4824 | ||
+ | ** 5.8: IHAM703.07242022_15:22:06 0.3907 | ||
+ | ** 5.7: IHAM703.07242022_15:23:14 0.3058 | ||
+ | ** 5.6: IHAM703.07242022_15:24:22 0.4229 | ||
+ | ** 5.5: IHAM703.07242022_15:25:27 0.4106 | ||
+ | ** 5.4: IHAM703.07242022_15:26:26 0.4095 | ||
+ | ** 5.3: IHAM703.07242022_15:27:33 0.4558 | ||
+ | ** 5.2: IHAM703.07242022_15:28:37 0.4519 | ||
+ | ** 5.1: IHAM703.07242022_15:29:38 0.4807 | ||
+ | ** 5.0: IHAM703.07242022_15:30:37 0.3753 | ||
+ | ** 4.9: IHAM703.07242022_15:31:40 0.5776 | ||
+ | ** 4.8: IHAM703.07242022_15:32:41 0.5999 | ||
+ | ** 4.7: IHAM703.07242022_15:33:41 0.6239 | ||
+ | ** 4.6: IHAM703.07242022_15:36:26 0.6529 | ||
== keV beam time == | == keV beam time == |
Revision as of 14:36, 24 July 2022
MeV beam time
- Measure MeV dispersion with BPMs
- TM beam to 703 to see RF drift (full shift)
- Verify optics setup for HKDL
- Ascertain the true frequency of the aliased GMES peak. Can the 105 kHz peak be the same that was 692 Hz in the last run?
- Buncher scan at 2-cell=2.5, 7-cell=9.0, both crested
- 6.2: IHAM703.07242022_15:16:35 0.6895
- 6.1: IHAM703.07242022_15:18:24 0.5668
- 6.0: IHAM703.07242022_15:19:35 0.4742
- 5.9: IHAM703.07242022_15:20:50 0.4824
- 5.8: IHAM703.07242022_15:22:06 0.3907
- 5.7: IHAM703.07242022_15:23:14 0.3058
- 5.6: IHAM703.07242022_15:24:22 0.4229
- 5.5: IHAM703.07242022_15:25:27 0.4106
- 5.4: IHAM703.07242022_15:26:26 0.4095
- 5.3: IHAM703.07242022_15:27:33 0.4558
- 5.2: IHAM703.07242022_15:28:37 0.4519
- 5.1: IHAM703.07242022_15:29:38 0.4807
- 5.0: IHAM703.07242022_15:30:37 0.3753
- 4.9: IHAM703.07242022_15:31:40 0.5776
- 4.8: IHAM703.07242022_15:32:41 0.5999
- 4.7: IHAM703.07242022_15:33:41 0.6239
- 4.6: IHAM703.07242022_15:36:26 0.6529
keV beam time
- LVQE scan at different voltages. Expect same result.
- HVQE scan at different voltages. Expect different result.
- CST: Does thermal energy affect collection efficiency?
- High current to FC2 for 12+ hours, check if drift is gone
Beam line modifications
- Put HKDL stuff into the machine ahead of time!