Difference between revisions of "Document-Controlled Procedures and Assessments for UITF"

From Ciswikidb
Jump to navigation Jump to search
 
(14 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
'''[[OSPs, TOSPs and LOSPs for UITF]]'''
 
'''[[OSPs, TOSPs and LOSPs for UITF]]'''
  
these procedures are managed via document control with links to individual procedures as shown, but note documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm
+
these procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm
  
Transferring(loading/removing)targets to/from the HDice IBC in cave-2 of the UITF, valid through 3/11/2023: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=94834   
+
Transferring (loading/removing) targets to/from the HDice IBC in cave-2 of the UITF, valid through 3/11/2023: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=94834   
  
HDIce Dump Magnet   
+
HDIce Dump Solenoid – Operating Magnet to Full Field, valid through 10/20/2020:  https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=95104    
  
UITF Cave2 ceiling roof tile removal  
+
UITF Cave2 ceiling roof tile removal, renewed and updated 7/12/2022: https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=135951
  
 
Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF, valid through 10/27/2021: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=80380
 
Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF, valid through 10/27/2021: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=80380
  
UITF 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility  
+
UITF 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility, valid through 2/20/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82655
  
UITF Commissioning the QCM with RF, no beam acceleration
+
UITF Commissioning the QCM with RF, no beam acceleration, valid through 2/13/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82424
  
UITF keV Beam Operations
+
keV beam line of the Upgraded Injector Test Facility (UITF), valid through 2/1/2026: https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=148151
  
UITF TOSP_high voltage conditioning a new photogun with 225kV Spellman supply
+
Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply (TOSP, not found via search tool, was not submitted I guess but could be useful someday so I save it here): [[media: Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply.docx]]
  
UITF Laser OSP
+
UITF Laser Systems LOSP, valid through 1/1/2026 : https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=147881
  
  
 
'''[[Other official documents managed via document-control, e.g., official assessments]]'''
 
'''[[Other official documents managed via document-control, e.g., official assessments]]'''
 +
 +
UITF RWP, https://www.jlab.org/esh/radcon/operations/RWPs
 +
 +
UITF Start Up Procedure, approved on 8/24/2020, saved to Docushare; https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-48330
  
 
UITF sweep procedure, updated 1/3/2020, Document Number:SSG-PR-03-101,Rev. 20.0 [[File: UITF sweep procedure_SSG-PR-03-101_Rev. 20.0_January 3, 2020.pdf]]
 
UITF sweep procedure, updated 1/3/2020, Document Number:SSG-PR-03-101,Rev. 20.0 [[File: UITF sweep procedure_SSG-PR-03-101_Rev. 20.0_January 3, 2020.pdf]]
  
Shielding Design Package from Vashek, approved by SCMB:  https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-200615/JLAB-TN-18-020.pdf, [[media:UITF shielding package by Vashek Vylet.pdf]],  Photos of trench foam and lead shielding [[media:UITF trench shielding with photos.xls]]
+
Shielding Design Package from Vashek, approved by SCMB:  https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-200615/JLAB-TN-18-020.pdf, Photos of trench foam and lead shielding [[media:UITF trench shielding with photos.xls]]
  
 
UITF SF6 tank pressure vessel assessment PS-ACC-17-001 can be found in DOCUSHARE at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38867 (Note, the pressure vessel assessment for a similar SF6 tank used at CEBAF can be found at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417)
 
UITF SF6 tank pressure vessel assessment PS-ACC-17-001 can be found in DOCUSHARE at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38867 (Note, the pressure vessel assessment for a similar SF6 tank used at CEBAF can be found at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417)
Line 32: Line 36:
 
UITF QCM Vacuum Vessel assessment: [[File:QCM Vacuum Vessel Assessment by Gary Cheng.docx]]
 
UITF QCM Vacuum Vessel assessment: [[File:QCM Vacuum Vessel Assessment by Gary Cheng.docx]]
  
UITF Final Approved ODH Assessment: [[File:UITF ODH Assessment.pdf]] and available at https://misportal.jlab.org/railsForms/oxygen_deficiency_reviews/74180/edit
+
UITF Approved ODH Assessment_revision2: [[File:UITF ODH Assessment_revision2.pdf]] and available at https://misportal.jlab.org/railsForms/oxygen_deficiency_reviews/112851/attachment/13530/ODH_UITF-Rev2%20-WO%20Edits_final.pdf
  
 
UITF Industrial Hygiene Assessment for SF6 exposure:  [[File:UITF SF6 assessment.pdf]]
 
UITF Industrial Hygiene Assessment for SF6 exposure:  [[File:UITF SF6 assessment.pdf]]
 +
 +
Trim Card Diagnostic and Replacement Procedure [[File:Trim Card Replacement Procedure_ACC-PR-01-004 Rev 7.pdf]]

Latest revision as of 11:58, 1 February 2023

OSPs, TOSPs and LOSPs for UITF

these procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm

Transferring (loading/removing) targets to/from the HDice IBC in cave-2 of the UITF, valid through 3/11/2023: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=94834

HDIce Dump Solenoid – Operating Magnet to Full Field, valid through 10/20/2020: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=95104

UITF Cave2 ceiling roof tile removal, renewed and updated 7/12/2022: https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=135951

Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF, valid through 10/27/2021: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=80380

UITF 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility, valid through 2/20/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82655

UITF Commissioning the QCM with RF, no beam acceleration, valid through 2/13/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82424

keV beam line of the Upgraded Injector Test Facility (UITF), valid through 2/1/2026: https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=148151

Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply (TOSP, not found via search tool, was not submitted I guess but could be useful someday so I save it here): media: Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply.docx

UITF Laser Systems LOSP, valid through 1/1/2026 : https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=147881


Other official documents managed via document-control, e.g., official assessments

UITF RWP, https://www.jlab.org/esh/radcon/operations/RWPs

UITF Start Up Procedure, approved on 8/24/2020, saved to Docushare; https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-48330

UITF sweep procedure, updated 1/3/2020, Document Number:SSG-PR-03-101,Rev. 20.0 File:UITF sweep procedure SSG-PR-03-101 Rev. 20.0 January 3, 2020.pdf

Shielding Design Package from Vashek, approved by SCMB: https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-200615/JLAB-TN-18-020.pdf, Photos of trench foam and lead shielding media:UITF trench shielding with photos.xls

UITF SF6 tank pressure vessel assessment PS-ACC-17-001 can be found in DOCUSHARE at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38867 (Note, the pressure vessel assessment for a similar SF6 tank used at CEBAF can be found at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417)

UITF QCM Vacuum Vessel assessment: File:QCM Vacuum Vessel Assessment by Gary Cheng.docx

UITF Approved ODH Assessment_revision2: File:UITF ODH Assessment revision2.pdf and available at https://misportal.jlab.org/railsForms/oxygen_deficiency_reviews/112851/attachment/13530/ODH_UITF-Rev2%20-WO%20Edits_final.pdf

UITF Industrial Hygiene Assessment for SF6 exposure: File:UITF SF6 assessment.pdf

Trim Card Diagnostic and Replacement Procedure File:Trim Card Replacement Procedure ACC-PR-01-004 Rev 7.pdf