== Agenda == | == Agenda == | ||
− | * IPAC'23 | + | * IPAC'23 - Joe, Amy, Reza, Eric - Which day is your poster? Plan to circulate poster and proceedings? |
− | + | :* Joe - Contribution #1313 submitted to IPAC’23 entitled "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" (programme code: MOPL152, https://www.overleaf.com/read/vqnhmpkrddbh - circulates this Thursday | |
− | : * Joe - ( | + | :* Reza - Presents Wed, circulates this weekend |
− | : * Reza - | + | :* Andriy - "Conceptual Design of a High-Power Target for Positron Production at CEBAF": https://www.overleaf.com/5323634316yytsftvttywt |
− | : * | + | :* Amy - ... |
− | : * | ||
− | * Status of PEPPo-II LDRD | + | * Max - Status of PEPPo-II LDRD proposal |
+ | ** Andriy's simulations | ||
+ | *** max e+ yield 6e-4 at 1 mm thickness | ||
+ | *** emittance cuts do not change this very much despite increase in beam size | ||
+ | *** deposited power favors thinner targets (but thermal conductivity may not?) | ||
+ | ** Chicane layout and integration into existing space: mostly determined by space constraints | ||
+ | *** [[File:20230412_092102.jpg|500px]] | ||
+ | *** after 0L02, make use of existing DP can, fast valve, at least 2 quads | ||
+ | *** could start at 5D line, gives us BCM and third quad for free, but perhaps not enough space | ||
+ | *** to use existing viewer, harp, quads, and FC2: reinject before ITV0L03? | ||
+ | ** whole chicane should work with 7 MeV electrons, but east leg must be achromatic on its own | ||
+ | ** RF positron capture does not seem viable (cost, power, time, space, everything) | ||
+ | ** Rough grocery list | ||
+ | *** west leg: 2 DL dipoles (scavenged), 1 valve, 4 correctors, 1+ BPM, 3 QD quads (2 can be easily scavenged). This is assuming achromatic design like UITF, but length is a problem (~ 2.5 m). Can choose to ignore dispersion... There are various design choices but no risks. | ||
+ | *** [[File:20230412_092115.jpg|500px]] | ||
+ | *** target line: 2 quads, 2 BPMs, 2+ correctors, 1 DP can, 1 valve, target, 2 solenoids, 2 apertures. No risks up to target, then dependent on capture simulation | ||
+ | *** east leg: needs lots of simulation to determine what we need; at least 2 special dipoles (maybe CFM), 1 aperture, 1 lens, 1 valve | ||
+ | *** [[File:20230412_092124.jpg|500px]] | ||
+ | *** 20+ magnet channels necessitates extra trim rack in ISB? | ||
+ | *** vacuum pumps TBD but likely not negligible | ||
+ | * Status from target working group | ||
+ | * Bob - status of SRF toy model | ||
+ | * Any other business... | ||
== Upcoming == | == Upcoming == | ||
* April 19 - Joint meeting with PWG | * April 19 - Joint meeting with PWG | ||
− | * May 7-13 - IPAC'23 | + | * May 7-13 - IPAC'23 (Joe, Amy, Reza, Eric) |
− | * May 15-19 - LCWS | + | * May 15-19 - LCWS (Andriy, Carlos) |
Latest revision as of 10:12, 12 April 2023
Meeting Coordinates
- On-site => Wednesdays @ 11am EDT in TL-2236
- Zoom => https://jlab-org.zoomgov.com/j/1616149761?pwd=SDJKY3NhWEtBOUR5MVR5RlY1R1pHdz09&from=addon
Agenda
- IPAC'23 - Joe, Amy, Reza, Eric - Which day is your poster? Plan to circulate poster and proceedings?
- Joe - Contribution #1313 submitted to IPAC’23 entitled "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" (programme code: MOPL152, https://www.overleaf.com/read/vqnhmpkrddbh - circulates this Thursday
- Reza - Presents Wed, circulates this weekend
- Andriy - "Conceptual Design of a High-Power Target for Positron Production at CEBAF": https://www.overleaf.com/5323634316yytsftvttywt
- Amy - ...
- Max - Status of PEPPo-II LDRD proposal
- Andriy's simulations
- max e+ yield 6e-4 at 1 mm thickness
- emittance cuts do not change this very much despite increase in beam size
- deposited power favors thinner targets (but thermal conductivity may not?)
- Chicane layout and integration into existing space: mostly determined by space constraints
- whole chicane should work with 7 MeV electrons, but east leg must be achromatic on its own
- RF positron capture does not seem viable (cost, power, time, space, everything)
- Rough grocery list
- west leg: 2 DL dipoles (scavenged), 1 valve, 4 correctors, 1+ BPM, 3 QD quads (2 can be easily scavenged). This is assuming achromatic design like UITF, but length is a problem (~ 2.5 m). Can choose to ignore dispersion... There are various design choices but no risks.
- target line: 2 quads, 2 BPMs, 2+ correctors, 1 DP can, 1 valve, target, 2 solenoids, 2 apertures. No risks up to target, then dependent on capture simulation
- east leg: needs lots of simulation to determine what we need; at least 2 special dipoles (maybe CFM), 1 aperture, 1 lens, 1 valve
- 20+ magnet channels necessitates extra trim rack in ISB?
- vacuum pumps TBD but likely not negligible
- Andriy's simulations
- Status from target working group
- Bob - status of SRF toy model
- Any other business...
Upcoming
- April 19 - Joint meeting with PWG
- May 7-13 - IPAC'23 (Joe, Amy, Reza, Eric)