Difference between revisions of "MOLLER PQB Meeting October 4, 2023"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "We will meet in TED 2559 Friday June 14 at 9:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone n...")
 
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
We will meet in TED 2559 Friday June 14 at 9:00 am EST.
 
  
== For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. ==
+
In person in MCC Conference Room and with Zoom.
Phone number: 1-888-240-2560
 
Meeting ID: 3528502673#
 
Meeting URL: http://bluejeans.com/3528502673
 
  
 +
https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam
 +
 +
--
  
 
'''Agenda:'''  
 
'''Agenda:'''  
  
1- PQB Setup status [[media:190614_PQB.pptx]] [[media:190614_PQB.pdf]]
+
1- MOLLER Accelerator Task List: [[media:MOLLER_Accelerator_Tasks_PQB_Meeting.pdf]]
:Start looking at PQB seriously about 4-5 days into receiving beam
+
: Updates - First KL beam in Injector is planned on October 11, 2023.
2- Daniel/Paul - Status of Injector Online Parity monitoring
 
:On-line plots updated ~30 sec pushed to logbook anyone can see, or in MCC w/ Hall A user logging in
 
3- Status of PQB feedback PV's
 
:Feedback plots updated ~10 sec pushed to PV's in archiver once Hall A in production mode
 
4- [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18789 Is RTP weekly measurement needed?]
 
:Not needed routinely, but may ask for occasional check, takes 19.8 minutes
 
5- [https://logbooks.jlab.org/entry/3687559 90Hz investigation]
 
:Root cause not identified, but only presents itself at HWien near -15 deg, will re-check w/ final setup and after spin dance
 
6- IHWP in/out updating of RTP PVs
 
: Joe/Brian/Paul/Caryn to meet, evaluate options A (write/push values using GUI) or B (write directly to RTP cell voltages)
 

Latest revision as of 10:27, 3 November 2023

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

1- MOLLER Accelerator Task List: media:MOLLER_Accelerator_Tasks_PQB_Meeting.pdf

Updates - First KL beam in Injector is planned on October 11, 2023.