Line 14: Line 14:
  
 
4- Two major MOLLER beam studies in April:
 
4- Two major MOLLER beam studies in April:
# FFB in Hall A: we want to start Hall A April run with FFB ON. Then, we will need 1-shift of beam studies to the hall at helicity flip of 2 kHz. We will also monitor resolution test at 2kHz in HallA (new bpms, bcms).
+
# FFB in Hall A: we want to start Hall A April run with FFB ON. Then, we will need 1-shift of beam studies to the hall at helicity flip of 2 kHz. We will also measure monitor resolution (new bpms, bcms).
 
# K-Long beam loading: we want 1-shift of beam studies with K-Long beam (5 uA low-rep rate) to Hall C and 40 uA to Hall A.
 
# K-Long beam loading: we want 1-shift of beam studies with K-Long beam (5 uA low-rep rate) to Hall C and 40 uA to Hall A.

Revision as of 07:49, 21 February 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

1- Took parity DAQ runs with every pattern to confirm pattern sequence. Checked patterns and delays with beam. Analysis underway.

2- Initial data to study correlation with K-Long charge asymmetry - Repeat with more statistics. Need to do SCL measurements with Hall D laser.

3- BCM Receiver tests update.

4- Two major MOLLER beam studies in April:

  1. FFB in Hall A: we want to start Hall A April run with FFB ON. Then, we will need 1-shift of beam studies to the hall at helicity flip of 2 kHz. We will also measure monitor resolution (new bpms, bcms).
  2. K-Long beam loading: we want 1-shift of beam studies with K-Long beam (5 uA low-rep rate) to Hall C and 40 uA to Hall A.