Difference between revisions of "MOLLER PQB Meeting March 6, 2024"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "In person in MCC Conference Room and with Zoom. https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam -- '''Agenda:''' 1- Two major MOLLER beam studies in April: #...")
 
Line 8: Line 8:
  
 
1- Two major MOLLER beam studies in April:
 
1- Two major MOLLER beam studies in April:
# FFB in Hall A: we want to start Hall A April run with FFB ON. Then, we will need 1-shift of beam studies to the hall at helicity flip of 2 kHz. We will also measure monitor resolution (new bpms, bcms).
+
# FFB in Hall A:  
 +
## BList to start Hall A April run with FFB ON - Ryan Bodestein
 +
## Blist to measure PQB beam in Hall A helicity flip of 2 kHz - MOLLER Collaboration
 +
## BList to measure monitor resolution (new bpms, bcms) - MOLLER Collaboration
 
# K-Long beam loading: we want 1-shift of beam studies with K-Long beam (5 uA low-rep rate) to Hall C and 40 uA to Hall A.
 
# K-Long beam loading: we want 1-shift of beam studies with K-Long beam (5 uA low-rep rate) to Hall C and 40 uA to Hall A.
  

Revision as of 13:47, 4 March 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

1- Two major MOLLER beam studies in April:

  1. FFB in Hall A:
    1. BList to start Hall A April run with FFB ON - Ryan Bodestein
    2. Blist to measure PQB beam in Hall A helicity flip of 2 kHz - MOLLER Collaboration
    3. BList to measure monitor resolution (new bpms, bcms) - MOLLER Collaboration
  2. K-Long beam loading: we want 1-shift of beam studies with K-Long beam (5 uA low-rep rate) to Hall C and 40 uA to Hall A.

2- Results of these two tests:

  1. IA scans at different helicity generator settings to verify 240 Hz modes work as expected.
  2. https://logbooks.jlab.org/entry/4258233
  3. https://logbooks.jlab.org/entry/4258232