Difference between revisions of "MOLLER PQB Meeting March 6, 2024"

From Ciswikidb
Jump to navigation Jump to search
Line 9: Line 9:
 
1- Two major MOLLER beam studies in April:
 
1- Two major MOLLER beam studies in April:
 
# FFB in Hall A:  
 
# FFB in Hall A:  
## BList to start Hall A April run with FFB ON - Ryan Bodestein
+
## BSList to start Hall A April run with FFB ON - Ryan Bodestein
## Blist to measure PQB beam in Hall A helicity flip of 2 kHz - MOLLER Collaboration
+
## BSList to measure PQB beam in Hall A helicity flip of 2 kHz - MOLLER Collaboration
## BList to measure monitor resolution (new bpms, bcms) - MOLLER Collaboration
+
## BSList to measure monitor resolution (new bpms, bcms) - MOLLER Collaboration
 
# K-Long beam loading: we want 1-shift of beam studies with K-Long beam (5 uA low-rep rate) to Hall C and 40 uA to Hall A.
 
# K-Long beam loading: we want 1-shift of beam studies with K-Long beam (5 uA low-rep rate) to Hall C and 40 uA to Hall A.
  

Revision as of 13:48, 4 March 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

1- Two major MOLLER beam studies in April:

  1. FFB in Hall A:
    1. BSList to start Hall A April run with FFB ON - Ryan Bodestein
    2. BSList to measure PQB beam in Hall A helicity flip of 2 kHz - MOLLER Collaboration
    3. BSList to measure monitor resolution (new bpms, bcms) - MOLLER Collaboration
  2. K-Long beam loading: we want 1-shift of beam studies with K-Long beam (5 uA low-rep rate) to Hall C and 40 uA to Hall A.

2- Results of these two tests:

  1. IA scans at different helicity generator settings to verify 240 Hz modes work as expected.
  2. https://logbooks.jlab.org/entry/4258233
  3. https://logbooks.jlab.org/entry/4258232