Difference between revisions of "MOLLER PQB Meeting March 6, 2024"

From Ciswikidb
Jump to navigation Jump to search
Line 16: Line 16:
 
## BSList to measure PQB beam in Hall A - MOLLER Collaboration
 
## BSList to measure PQB beam in Hall A - MOLLER Collaboration
  
2- Results of IA scans at different helicity generator settings to verify new firmware works as expected
+
2- Results of IA scans at different helicity generator settings to verify new firmware

Revision as of 14:43, 6 March 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

1- Two major MOLLER beam studies in April:

  1. FFB in Hall A:
    1. BSList to start Hall A April run with FFB ON - Ryan Bodestein
    2. BSList to measure PQB beam in Hall A helicity flip of 2 kHz - MOLLER Collaboration
    3. BSList to measure monitor resolution (new BPMs, BCMs) - MOLLER Collaboration
  2. K-Long Beam Loading:
    1. BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman
    2. BSList to measure PQB beam in Hall A - MOLLER Collaboration

2- Results of IA scans at different helicity generator settings to verify new firmware