Difference between revisions of "MOLLER PQB Meeting March 20, 2024"

From Ciswikidb
Jump to navigation Jump to search
Line 13: Line 13:
 
# '''K-Long Beam Loading:''' (tentatively scheduled on May 1)  
 
# '''K-Long Beam Loading:''' (tentatively scheduled on May 1)  
 
## BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [https://tasklists.jlab.org/bslist/tasks/111261]
 
## BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [https://tasklists.jlab.org/bslist/tasks/111261]
## BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi
+
## BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi: [https://tasklists.jlab.org/bslist/tasks/111367]

Revision as of 12:05, 19 March 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

1- Two major MOLLER beam studies in Hall A:

  1. FFB in Hall A: (tentatively scheduled on April 17)
    1. BSList to start Hall A April run with FFB ON - Ryan Bodestein: [1]
    2. BSList to measure PQB beam in Hall A helicity flip of 2 kHz and to measure monitor (BPMs, BCMs) resolution: [2]
  2. K-Long Beam Loading: (tentatively scheduled on May 1)
    1. BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [3]
    2. BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi: [4]