Difference between revisions of "MOLLER PQB Meeting March 20, 2024"
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
## BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [https://tasklists.jlab.org/bslist/tasks/111261] | ## BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [https://tasklists.jlab.org/bslist/tasks/111261] | ||
## BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi: [https://tasklists.jlab.org/bslist/tasks/111367] | ## BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi: [https://tasklists.jlab.org/bslist/tasks/111367] | ||
− | ## Other issues to look for: | + | ## '''Other issues to look for:''' |
### 4-Wire BPMs saturation in West Arc | ### 4-Wire BPMs saturation in West Arc | ||
### Exciting higher order modes in cavities | ### Exciting higher order modes in cavities |
Revision as of 12:26, 19 March 2024
In person in MCC Conference Room and with Zoom.
https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam
--
Agenda:
1- Two major MOLLER beam studies in Hall A:
- FFB in Hall A: (tentatively scheduled on April 17)
- K-Long Beam Loading: (tentatively scheduled on May 1)