Difference between revisions of "MOLLER PQB Meeting March 20, 2024"
Jump to navigation
Jump to search
(4 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
1- '''Two major MOLLER beam studies in Hall A:''' | 1- '''Two major MOLLER beam studies in Hall A:''' | ||
# '''FFB in Hall A:''' (tentatively scheduled on April 17) | # '''FFB in Hall A:''' (tentatively scheduled on April 17) | ||
− | ## BSList to start Hall A April run with FFB ON - Ryan Bodestein: [https://tasklists.jlab.org/bslist/tasks/ | + | ## BSList to start Hall A April run with FFB ON - Ryan Bodestein: [https://tasklists.jlab.org/bslist/tasks/111381] |
## BSList to measure PQB beam in Hall A helicity flip of 2 kHz and to measure monitor (BPMs, BCMs) resolution: [https://tasklists.jlab.org/bslist/tasks/109569] | ## BSList to measure PQB beam in Hall A helicity flip of 2 kHz and to measure monitor (BPMs, BCMs) resolution: [https://tasklists.jlab.org/bslist/tasks/109569] | ||
# '''K-Long Beam Loading:''' (tentatively scheduled on May 1) | # '''K-Long Beam Loading:''' (tentatively scheduled on May 1) | ||
## BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [https://tasklists.jlab.org/bslist/tasks/111261] | ## BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [https://tasklists.jlab.org/bslist/tasks/111261] | ||
## BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi: [https://tasklists.jlab.org/bslist/tasks/111367] | ## BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi: [https://tasklists.jlab.org/bslist/tasks/111367] | ||
− | ## Other issues to look for | + | ## '''Other issues to look for:''' |
− | ### 4- | + | ### 4-channel BPMs saturation in West Arc |
− | ### | + | ### Dumping beam harmonics right onto one of the higher order mode frequencies |
+ | |||
+ | 2- Fix Hall D Tune-Mode-Generator; it has low extinction ratio |
Latest revision as of 13:55, 20 March 2024
In person in MCC Conference Room and with Zoom.
https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam
--
Agenda:
1- Two major MOLLER beam studies in Hall A:
- FFB in Hall A: (tentatively scheduled on April 17)
- K-Long Beam Loading: (tentatively scheduled on May 1)
2- Fix Hall D Tune-Mode-Generator; it has low extinction ratio